Merkle Standard: a former paper mill becomes a mining campus

Ponderay Industries reported that Merkle Standard began operating a mining data centre at its paper-mill campus in 2022. The mill had entered bankruptcy in 2020 and was acquired in 2021. This is a reuse of industrial land and power infrastructure, rather than evidence of paper waste being converted into mining fuel.

Renewables and heat reuse

Usk, Washington, USAHistorical operation / evolving useReviewed 29 September 2026

Ponderay Industries reported that Merkle Standard began operating a mining data centre at its paper-mill campus in 2022. The mill had entered bankruptcy in 2020 and was acquired in 2021. This is a reuse of industrial land and power infrastructure, rather than evidence of paper waste being converted into mining fuel.

Project at a glance
Former Ponderay paper-mill campus
Source date and context
31 August 2022; later context checked September 2026
Published financial detail
The sources reviewed do not include full project accounts.
Our comparison
A UK example per 1,000 miner kWh

About 6 minutes to read

From paper mill campus to computing site

Ponderay is a story about reusing an industrial site. The paper mill entered bankruptcy in 2020, was acquired in 2021, and its owner reported mining operations beginning in 2022. Existing electrical infrastructure, buildings and access were part of the opportunity. The cited evidence does not show paper waste being converted into fuel for Bitcoin mining.

“Merkle Standard began data center operations on the shared industrial campus earlier this year.”

Ponderay Industries, August 2022 announcement · Read the source
  1. 2020The paper mill entered bankruptcy.
  2. 2021The mill assets were acquired by a new owner.
  3. 2022Ponderay Industries reported Merkle Standard mining operations at the campus.
  4. 2026Local reporting described a move towards AI computing.

The connection and buildings were part of the value

Existing industrial campus and grid connectioncomputingpotential local heat use

Reporting in 2022 described mining heat warming the mill. A 2026 local report discusses a transition towards AI, while the operator now markets broader computing infrastructure. These are different stages of the site's history. A valuation should distinguish the paper business, the mining operation and later plans, and check the condition and legal use of the electrical connection.

What the numbers could look like in the UK

The calculation below uses assumed UK prices to show how the costs fit together. It is our example, not this project’s reported earnings. Replace the inputs with current machine estimates and the costs at your own site.

Illustrative UK calculation

Income and running costs

1,000 kWh used by miners, plus 50 kWh for pumps and fans. All amounts in pounds.

Gross mining income£80.00
Useful heat value£36.00
Export income forgone£52.50
Pool fee£1.60
Other running costs£10.00

Operating contributionBefore equipment and installation costs

£51.905.19p per miner kWh

Here, using the electricity for mining gives up a 5p/kWh export payment. That cost includes the 50 kWh used by pumps and fans. It is the value of an alternative sale, so it is not also charged as a grid electricity bill. The example assumes the generation equipment already exists.

Assumptions used in this example
Mining income 8p per miner kWh; an assumed rate, not a live earnings estimate
Electricity 5p/kWh × 1,050 kWh = £52.50
Pool fee 2% of gross mining income
Useful heat 60% of miner electricity = 600 kWh; valued at 6p per delivered kWh
Other running costs £10 per 1,000 miner kWh; an allowance to replace with your own costs
Costs still to add Equipment, installation, finance, tax, depreciation, major replacements and any costs above the allowance

The contribution is what remains from mining income and useful heat after the stated running costs. It is not net profit: the equipment and other excluded costs still have to be recovered. Pumps and fans use electricity but earn no mining income in this calculation.

If mining income rises or fallsOperating contribution per 1,000 miner kWh
Gross income per miner kWh Without heat value With useful heat
5p −£13.50 £22.50
8p Chart example £15.90 £51.90
11p £45.30 £81.30
Mining income needed to cover running costs
2.70pper miner kWh
Highest electricity cost or export value supported
9.94pper total electricity kWh

These are two ways to read the same example. Adding equipment costs or a larger maintenance allowance raises the income needed and reduces the electricity price the project can afford.

Compare heating options and work out annual costs

Use the heating system you would actually choose as the comparison. For example, a heat pump using electricity at 20p/kWh with a seasonal COP of 3 has an electricity cost of about 6.67p per kWh of heat. A resistance heater at that tariff uses 20p per kWh of heat. These are calculation examples, rather than measurements from this project.

For an annual estimate, use the miner electricity expected during hours when running makes sense. Scale the contribution by annual miner kWh divided by 1,000, then deduct fixed annual costs. Recalculate if electricity prices, mining income or usable heat change.

Simple payback is the total installed cost divided by positive annual cash contribution. There is no payback under a scenario with zero or negative contribution. The sources reviewed here do not provide the full project accounts needed to calculate an actual payback for this installation.

Follow the changes in use over time

Investigate the value of an existing industrial connection, buildings and heat demand before assuming a new power plant is necessary.

Separate paper production, mining and later computing plans in the timeline. Obtain electrical rights, actual operating load and any metered heat benefit before valuing the campus.

Questions worth asking

  • Which infrastructure is reusable without major upgrades?
  • Are employment and restart claims about the mill or the data centre business?

Try your own electricity and heat figures

Compare available miners and dated earnings estimates. Include heat only where you can use it or have a customer for it.

Model renewable miningCompare with grid export

Sources and photographs

Sources checked on 29 September 2026. Project facts and quotations come from the publications below; the UK calculations and practical assessment are The Mining Shop’s analysis. This article is based on published material, rather than a site visit.

  1. Ponderay Industries company announcement
  2. Merkle Standard infrastructure and strategy
  3. InvestigateWest / Cascade PBS site reporting
  4. 2026 local report on the AI transition

Photographs: Merkle Standard (source).

ASIC MINER PICKS

Recommended ASIC Mining Hardware

Compare three of our highest ranked ASIC miners currently available, with live product details and pricing.
Browse all ASIC miners
MORE MINING ADVICE

More ASIC Mining Articles

Read practical advice about choosing hardware, calculating electricity costs, setting up miners, hosting and maintenance.
MINER COMMUNITY

Join the ASIC Mining Discussion

Ask a question or share what has worked for you. Your experience may help another miner make a better decision.

Members can read and join the discussion

Log in to read comments from other miners. Create a free account if you would like to ask a question or share your experience.

Log in to read comments Register to join the discussion

Membership helps us protect the discussion from spam and keep answers useful.

ASIC MINING SUPPORT

Need Help Choosing an ASIC Miner?

Tell us what you want to mine, your electricity cost and where the machine will run. We can help you compare hardware, power requirements, hosting and repairs.
Contact our mining team
Browse ASIC miners