Sazmining Kirkenes: a former hospital becomes a Bitcoin heat customer

Sazmining describes a 2.5 MW site serving a former hospital converted into a business centre. Separate water loops transfer heat to the building, with backup heating retained.

Renewables and heat reuse

Kirkenes, NorwayOperator reportedReviewed 29 September 2026

Sazmining describes a 2.5 MW site serving a former hospital converted into a business centre. Separate water loops transfer heat to the building, with backup heating retained.

Project at a glance
2.5 MW site reported
Source date and context
28 February 2026; updated 1 March 2026
Published financial detail
The sources reviewed do not include full project accounts.
Our comparison
A UK example per 1,000 miner kWh

About 5 minutes to read

A former hospital becomes the heat customer

Sazmining describes a 2.5 MW installation serving a former hospital that has become a business centre in Kirkenes. Heat moves from the mining circuit into a separate building circuit, and backup heating remains available. The operator says the site has a service agreement to deliver heat. That makes building comfort an operating commitment, with consequences for controls, maintenance and equipment availability.

“The site operates with an SLA to deliver heat”

Sazmining, February 2026 engineering account · Read the source

Separate water circuits and a summer outlet

Hydro-cooled minersseparate water loopsbuilding heating

The building needs much less heat in summer than in winter. The miners may still be running, so the system needs somewhere to reject unwanted heat. Useful annual output is the heat delivered to the building, measured over time. Multiplying the mining capacity by every hour of the year would overstate that benefit.

What the numbers could look like in the UK

The calculation below uses assumed UK prices to show how the costs fit together. It is our example, not this project’s reported earnings. Replace the inputs with current machine estimates and the costs at your own site.

Illustrative UK calculation

Income and running costs

1,000 kWh used by miners, plus 50 kWh for pumps and fans. All amounts in pounds.

Gross mining income£80.00
Useful heat value£48.00
Electricity purchased£126.00
Pool fee£1.60
Other running costs£10.00

Operating contributionBefore equipment and installation costs

−£9.60−0.96p per miner kWh

This example buys electricity at 12p/kWh and values useful heat at 6p/kWh. These are assumed prices. The heat value should be replaced with the actual cost of the heating you would otherwise use, or the price a customer agrees to pay.

Assumptions used in this example
Mining income 8p per miner kWh; an assumed rate, not a live earnings estimate
Electricity 12p/kWh × 1,050 kWh = £126.00
Pool fee 2% of gross mining income
Useful heat 80% of miner electricity = 800 kWh; valued at 6p per delivered kWh
Other running costs £10 per 1,000 miner kWh; an allowance to replace with your own costs
Costs still to add Equipment, installation, finance, tax, depreciation, major replacements and any costs above the allowance

The contribution is what remains from mining income and useful heat after the stated running costs. It is not net profit: the equipment and other excluded costs still have to be recovered. Pumps and fans use electricity but earn no mining income in this calculation.

If mining income rises or fallsOperating contribution per 1,000 miner kWh
Gross income per miner kWh Without heat value With useful heat
5p −£87.00 −£39.00
8p Chart example −£57.60 −£9.60
11p −£28.20 £19.80
Mining income needed to cover running costs
8.98pper miner kWh
Highest electricity cost or export value supported
11.09pper total electricity kWh

These are two ways to read the same example. Adding equipment costs or a larger maintenance allowance raises the income needed and reduces the electricity price the project can afford.

Compare heating options and work out annual costs

Use the heating system you would actually choose as the comparison. For example, a heat pump using electricity at 20p/kWh with a seasonal COP of 3 has an electricity cost of about 6.67p per kWh of heat. A resistance heater at that tariff uses 20p per kWh of heat. These are calculation examples, rather than measurements from this project.

For an annual estimate, use the miner electricity expected during hours when running makes sense. Scale the contribution by annual miner kWh divided by 1,000, then deduct fixed annual costs. Recalculate if electricity prices, mining income or usable heat change.

Simple payback is the total installed cost divided by positive annual cash contribution. There is no payback under a scenario with zero or negative contribution. The sources reviewed here do not provide the full project accounts needed to calculate an actual payback for this installation.

Treat heating as a service obligation

A heat-service commitment needs controls, backup capacity and a summer heat-rejection route.

Measure the building heat load across seasons and establish which party owns each water circuit. Record both heat delivered and heat rejected, together with backup operation.

Questions worth asking

  • Does the site still need all its computing capacity in summer?
  • Which party has priority during electricity-price spikes?

Try your own electricity and heat figures

Compare available miners and dated earnings estimates. Include heat only where you can use it or have a customer for it.

Model renewable miningCompare with grid export

Sources and photographs

Sources checked on 29 September 2026. Project facts and quotations come from the publications below; the UK calculations and practical assessment are The Mining Shop’s analysis. This article is based on published material, rather than a site visit.

  1. Sazmining engineering account

Photographs: Sazmining (source).

ASIC MINER PICKS

Recommended ASIC Mining Hardware

Compare three of our highest ranked ASIC miners currently available, with live product details and pricing.
Browse all ASIC miners
MORE MINING ADVICE

More ASIC Mining Articles

Read practical advice about choosing hardware, calculating electricity costs, setting up miners, hosting and maintenance.
MINER COMMUNITY

Join the ASIC Mining Discussion

Ask a question or share what has worked for you. Your experience may help another miner make a better decision.

Members can read and join the discussion

Log in to read comments from other miners. Create a free account if you would like to ask a question or share your experience.

Log in to read comments Register to join the discussion

Membership helps us protect the discussion from spam and keep answers useful.

ASIC MINING SUPPORT

Need Help Choosing an ASIC Miner?

Tell us what you want to mine, your electricity cost and where the machine will run. We can help you compare hardware, power requirements, hosting and repairs.
Contact our mining team
Browse ASIC miners