Skip to main content
£0.00 0

Basket

No products in the basket.

RENEWABLE COMPUTE + HEAT

Bitcoin mining heat recovery for renewable energy

Put your stranded energy to work. Turn surplus renewable electricity into Bitcoin mining revenue and recover useful heat. Designed for sites where grid constraints, export limits or low export prices leave generation underused.
Use available power on site. Model the value for your site.
EXPLORE THE OPTIONS / CHECK THE EVIDENCE

Go deeper into renewable mining.

Mining with renewables

Explore farm, solar, wind and hydro applications, compare miner energy use and earnings, and browse 26 sourced renewable and heat-reuse records.

Mining instead of grid export

Use your actual export payment, surplus kW and operating hours to compare Bitcoin earnings with exporting, including costs and useful heat.
SOLAR
WIND
BIOGAS & CHP
PRIVATE WIRE
UNDERSTANDING STRANDED ENERGY

Power available. Limited routes to market.

Stranded energy is electricity you could generate but cannot readily use or sell economically. Your grid connection may restrict exports, local demand may fall below generation, or export prices may make generation unattractive.
A controllable mining installation provides an on-site use for available electricity. Its size and operating schedule are matched to your generation, site priorities and commercial conditions. Connection, planning and engineering requirements are assessed for each site.
Current eligible ASIC range

What could your electricity generate?

Gross earnings: £0.050–£0.499 per kWh
THE STRANDED ENERGY OPPORTUNITY

An on-site use for energy you cannot readily sell.

Low export value

At times of high generation, export electricity can have low value, or your tariff may face constraints.

Restricted generation

Grid constraints can limit how much you can generate, even when you have the resource.

Useful heat demand

Where heat demand and temperatures align, recovered heat can replace fuel you buy today.
BITCOIN MINING EXPLAINED

What is Bitcoin mining?

Bitcoin mining uses specialist computers to help verify transactions and secure the Bitcoin network. These computers perform calculations and compete to earn rewards paid in Bitcoin.
Most commercial miners join a mining pool, which shares rewards among participants according to their contribution. Mining consumes electricity and produces heat. Locating equipment beside your renewable generation lets us use available power on site and, where practical, recover heat for buildings or processes.

A local electricity user

Equipment operates close to your generation, creating an on-site use for stranded power.

A controllable load

Mining can turn down or stop as available power changes, subject to equipment and control design.

Revenue and useful heat

Computing earns Bitcoin. Recovered heat can also replace purchased fuel where demand and temperatures align.
COMPARE ASIC MINERS

Compare the Highest Earning ASIC Miners

Compare eligible ASIC models by gross earnings per kWh. Availability varies by model.
Ten highest daily-earning eligible ASIC models, displayed in descending gross earnings per kWh order. Highest-earning qualifying variant per model; home and discontinued miners excluded. Annual figures extrapolate the daily rate over 365.25 days and are not forecasts.
MachinePowerEfficiencyGross / DayGross / YearGross / kWhProduct link
bitmain antminer z15 pro 860ksol equihash zcash miner main product view 1 12651
Bitmain Antminer Z15 Pro 860KSol Equihash · In Stock Highest gross per kWh
2.84kW 3.3W/KSOL £32.41 £11,837.75 47.58p View Miner
bitmain antminer z15k 525ksol equihash zcash miner main product view 1 42026
Bitmain Antminer Z15K 525KSol Equihash · Pre Order
2.48kW 4.73W/KSOL £19.78 £7,224.65 33.19p View Miner
8.37kW 9.45W/TH £22.95 £8,382.49 11.42p View Miner
8.65kW 10W/TH £22.41 £8,185.25 10.79p View Miner
bitdeer sealminer a4 pro hydro 680th sha 256 bitcoin miner main product view 1 42117
Bitdeer Sealminer A4 Pro Hydro 680Th SHA-256 · Coming Soon
7.41kW 10.9W/TH £17.62 £6,435.71 9.91p View Miner
8.25kW 12.5W/TH £17.10 £6,245.78 8.64p View Miner
bitdeer sealminer dl1 hydro 52 5gh scrypt litecoin dogecoin miner main product view 1 42119
Bitdeer Sealminer DL1 Hydro 52.5Gh Scrypt · Coming Soon
7.82kW 149W/GH £15.62 £5,705.21 8.32p View Miner
11.18kW 13W/TH £22.28 £8,137.77 8.30p View Miner
9.07kW 13.5W/TH £17.41 £6,359.00 8.00p View Miner
9.07kW 14W/TH £16.79 £6,132.55 7.71p View Miner
Gross earnings are before electricity, cooling, pool fees and other costs. Figures change with coin prices and network conditions. Efficiency units differ between algorithms and are not directly comparable.
Includes in-stock, coming-soon, backorder, preorder and out-of-stock ASIC miners earning at least £0.05 per kWh. Home and discontinued miners are excluded. Read the mining risk disclaimer.
HOW IT WORKS

One controllable system. Three sources of value.

Generation

Solar, wind, biogas & CHP

Site energy controls

Balances your priorities

Your site

On-site power needs first

Grid export

Export when it makes sense

Compute

Flexible computing load

Useful heat

Recovered heat for your site
01

Compute income

Bitcoin-denominated revenue from flexible computing.
02

Recovered heat

Potential savings where usable heat replaces fuel.
03

Dispatch flexibility

Respond to site priorities and export conditions.
Site-specific. Heat savings and compute income are assessed separately.
Illustrative containerised compute and heat-recovery installation
OUR APPROACH

Designed around your site.

Your own power needs come first

We integrate with your existing systems and priorities.

A load that follows generation

Controls respond to available power and agreed commercial rules.

Heat recovery matched to demand

We design for your site’s actual heat requirements.

Three ways to work together.

Hosted energy

We operate. You supply power. An agreed price for metered electricity.

Client ownership

Your equipment. Our expertise. We design, integrate and maintain.

Co-investment

A shared project. An agreed structure for capital, revenue and risk.

From first conversation to operation.

01

Assess

Understand your site, power and heat demand.
02

Design

Model, specify and design the solution.
03

Agree

Agree commercial terms and plan delivery.
04

Install & operate

Install, prove, monitor and support.

Request a site assessment

No need to have all your energy data ready.
We use these details to respond to your enquiry.
LET’S LOOK AT YOUR SITE

Find out what your stranded energy could be worth.

Start with a few details. We’ll help establish whether your site is a good fit.
Typically 300 kW+ available
A connection you control
Space for equipment