MINING BUNDLE
284x Antminer S21 319TH + ANTSPACE HW7 Container · T-type
SHA-256 · 90.6 PH/s
284 miners · Hydro cooling · With container
Pre-Order

Catalogue preview — this bundle is not available to order yet.
- Hashrate
- 90.6 PH/s319 TH/s each
- Algorithm
- SHA-256
- Efficiency
- 16W/TH
- Power
- 1.45MW5.1kW each
- Miner Load
- 1.45MWAuxiliary power pending
- Earns/kWh
- Pending
Total Saving £112,160.00
Component Miner Rankings
These are the included individual miners’ existing ranks. Bundle economics use the complete configuration price, delivery, discount and auxiliary power. Mixed fleets show an average component percentage score, with the individual ranks in its breakdown.
Selected Equipment Schedule
284 miners · Pending operating load. Only the following quantities and products are included in this configuration.
| Equipment | Quantity | Role |
|---|---|---|
| Bitmain Antminer S21 Hydro 319Th SHA-256 Bitcoin Miner | 284 | Miner |
| Bitmain ANTSPACE HW7 2MW Hydro Mining Container | 1 | Infrastructure |
Container Layout · T-type.
Container Planning & Headroom
Provisional maximum per container: 284 miners, in 2 equal groups. Quantities allow 5% above listed miner power and reserve 10% of reference cooling and electrical capacity, and of flow where published. This is a planning allowance, not installation approval.
- Miner Design Load
- 1.52MW
- Auxiliary Electrical Allowance
- 255kW
- Cooling Headroom
- 317.99kW
- Coolant Flow Allowance
- 170.40 m³/h
Auxiliary allowances are conservative design bounds, not average electricity consumption. Running costs remain unconfirmed until the complete load schedule is supplied.
Normal stock operation, no overclocking. Hydro inlet at or below 35 C. Site ambient, fluid, pressure, branch circuits and delivered revision require confirmation.
Use the standard 2100kW value as the planning ceiling, not the 2500kW maximum. Budget separate no-load container/tower bounds of 160+95kW; possible overlap and concurrent draw remain unresolved. Only the container 160kW bound is charged to the liquid circuit. Two independent cooling sides.
Individual Miner Connection
The miner maximum input current is within the published bay reference. Confirm the delivered connectors, protection, voltage and revision.
- Miner Maximum Input
- 12A
- Published Bay Reference
- 14.5A
Miner electrical specification
Manufacturer Equipment Reference
Container with two distribution cabinets, four supply circuits and two cooling circuits; matched 2000kW dry tower (1000kW per side), pumps and controls. The reference input is AC380–480V, 50/60Hz; individual miner and branch requirements still apply.
Outstanding Supplier Checks
- Confirm the delivered T-type or 2U-type revision and priced tower, pumps, pipework, controls and coolant schedule.
- Reconcile the 160kW container and 95kW tower limits; neither is a measured complete operating load.
- S21 Hydro 319TH is rated 12A maximum, within the 14.5A bay reference; exact connectors/protection still need confirmation. S23e U2H specifies 20A maximum, LP34 power and UQD08 coolant connectors, requiring its matched 2U branch revision. Reducing fleet size does not resolve branch compatibility.
- Confirm cooler duty at the site ambient and fluid temperatures; the water-curtain table has inconsistent temperature notes.
Price Breakdown & Volume Discount
- Miner Subtotal
- £690,972.00
- Infrastructure Subtotal
- £86,100.00
- Miner Discount
- 15%
- Recorded AER Delivery Allowances
- £57,300.00
The volume discount applies once to current published miner prices, including their embedded delivery allowance. Freight enters the complete package total once. Infrastructure is not discounted. Existing AER £10 rounding applies. Unconfirmed amounts are indicative, not an orderable offer.
Power Consumption & Installation Requirements
- Miner Load
- 1.45MW
- Auxiliaries
- Unconfirmed
- Known Load Only
- 1.45MW
- Energy per 24 Hours
- 34,788.864kWh
Miner-only consumption is shown while auxiliary power is unconfirmed. Pumps, fans, controls and other site loads must be added; this is not a complete operating total.
Mining Earnings & Block Odds
Scenario, odds & assumptions
Constant-condition scenario, not a forecast. 100% operating time, £0.000/kWh, 2% pool service fee and 0% Solo service fee. Fees are editable assumptions; confirm your chosen provider’s charges. Network transaction rewards are included in the shared source estimate.
Operating power Pending includes Pending auxiliaries. Miner quantities are fixed. Auxiliary inputs must cover the listed cooling equipment.
Bitcoin equivalent is a display conversion of the selected mining routes, not a claim that the hardware mines Bitcoin. Recorded Bitcoin price £62,529.12 at 2026-10-21T11:03:09+00:00.
Auto selects the highest expected annual return after the entered fees and operating electricity for each algorithm. Equipment cost is fixed for the selected configuration. A higher expected Solo return does not mean a reliable payout.
- Quai Expected Blocks / Year
- 18,436,347.959288
- At Least One Block
- ≈100%
- No Blocks
- <0.0001%
- Block Value
- £0.06
Block probabilities use this fleet’s actual hashrate over the selected timeframe. Fractional expected blocks are a statistical average, not part of a block paid to you.
Excludes hosting, maintenance, taxes, finance and other operating charges not explicitly entered. Prices, difficulty, rewards and uptime can change. Network inputs: . Calculated .
| Asset / Mode | Expected Earnings |
|---|---|
| SHA-256 · Quai · Solo | £1,070,425.68 |
| SHA-256 · eCash · Solo | £1,035,898.92 |
| SHA-256 · Fractal Bitcoin · Solo | £957,951.02 |
| SHA-256 · Bitcoin Cash · Solo | £957,448.12 |
| SHA-256 · Bitcoin Cash · Pool | £945,845.69 |
| SHA-256 · Bitcoin · Solo | £933,709.92 |
| SHA-256 · eCash · Pool | £929,443.74 |
| SHA-256 · Fractal Bitcoin · Pool | £896,437.35 |
| SHA-256 · Bitcoin · Pool | £894,007.43 |
| SHA-256 · Bitcoin · Pool | £892,387.49 |
| SHA-256 · Quai · Pool | £875,985.54 |
| SHA-256 · DigiByte · Pool | £674,302.32 |
| SHA-256 · DigiByte · Solo | £644,998.64 |
Equipment Scope & Site Requirements
The selected equipment schedule itemises the miners and container(s). Manufacturer system reference: Container with two distribution cabinets, four supply circuits and two cooling circuits; matched 2000kW dry tower (1000kW per side), pumps and controls. The reference input is AC380–480V, 50/60Hz; individual miner and branch requirements still apply. The saved price record does not independently confirm the supplied packing list. Final tower, pump, controls, pipework, miner connections and coolant inclusions require supplier confirmation.
Site works, upstream electrical supply, networking, commissioning, maintenance and any equipment not itemised.
- Miners and exact supply batch — see the itemised schedule.
- Rack, tank or container and chassis compatibility — included only if expressly itemised; otherwise excluded.
- Pumps and coolant distribution — included only if expressly itemised; otherwise excluded.
- Dry cooler or heat exchanger — included only if expressly itemised; otherwise excluded.
- Immersion fluid or approved hydro coolant — included only if expressly itemised; otherwise excluded.
- Pipework, valves and connections — included only if expressly itemised; otherwise excluded.
- Electrical distribution, protection and cabling — included only if expressly itemised; otherwise excluded.
- Networking, commissioning and site work — included only if expressly itemised; otherwise excluded.
Availability
This configuration is a draft and is not available to buy yet. The included equipment, pricing and stock must be complete before it is listed for sale.
Outstanding Configuration Checks
- State auxiliary power and reserve explicitly.
- Complete-package delivery allowance is missing.
- Infrastructure capacities need verification.
- Auxiliary load must include the infrastructure auxiliaries.
- Itemise the complete auxiliary load, including pumps, fans, coolers and controls.
- The complete auxiliary schedule must match the reviewed per-module loads; external loads cannot bypass module capacity checks.
- Electrical supply capacity is missing.
- Record the installation electrical reserve explicitly.
- Exact equipment fit and installation design need confirmation.
- Record the reviewed electrical design and its evidence.
- Record the reviewed cooling design and its evidence.
- Record the reviewed ancillaries design and its evidence.
- No valid per-module placement was found for the fleet and cooling limits.
- Planning headroom is provisional; confirm the supplied revision, site conditions and complete auxiliary schedule before installation approval.
- The component specification or price changed; review this package.