Skip to main content
£0.00 0

Basket

No products in the basket.

Bitmain ANTSPACE HW7 2MW Hydro Mining Container product view 1
Bitmain ANTSPACE HW7 2MW Hydro Mining Container product view 1

BITMAIN · Mining containers

ANTSPACE HW7

Hydro mining container

November preorder

Price on request. This mining container is available by enquiry. Contact us for a quotation covering the required configuration, delivery and installation arrangements. Request a quote.

The ANTSPACE HW7 offers a 2 MW hydro cooling platform with layouts for standard hydro miners or 2U machines. The miner layout must be selected before the electrical and cooling plan is finalised.

Container price

£86,600.00

Delivery, tax treatment and equipment inclusions confirmed with your quotation.

Cooling capacity2000 kW
Miner positionsUp to 396 T type or 242 2U
CoolingHydro

01 / Technical details

Specifications at a glance.

Check the figures for ANTSPACE HW7 against your miner fleet and available site services.

Cooling class2000 kW
Standard layout396 hydro miners
Alternative layout242 miners in 2U format
Release year2026
Headroom reference (11 October 2026)Manual v1.0.11: two 1000kW cooling sides; 2100kW standard and 2500kW maximum electrical power references.
Coolant flow referencePer side: 95m3/h for the standard layout or 116m3/h for the 2U layout. Match the exact manifold and connector configuration.
Auxiliary power referenceContainer no-load <=160kW; dry tower <=95kW. Their overlap and concurrent operating draw need confirmation. Planning reserves both bounds.

Manufacturer reference values. Final configuration and equipment schedule confirmed before ordering.

02 / The equipment

Built around the site.

Choose the configuration around the miner fleet and available site services.

Inside the installation

The ANTSPACE HW7 offers a 2 MW hydro cooling platform with layouts for standard hydro miners or 2U machines. The miner layout must be selected before the electrical and cooling plan is finalised.

The two layouts serve different chassis formats. A larger position count does not mean the same machines fit both versions.

Defining the scope

The quotation identifies the supplied equipment, compatible miners and required connections. Final capacity depends on the selected hardware and site conditions.

Cooling explained

Show how the cooling works

See how this cooling method moves heat away from the mining hardware.

Liquid through the miner

Coolant flows through passages inside a compatible hydro miner. It carries heat into pipework and onward to the cooling equipment. The electronics are not submerged.

Why choose hydro

Liquid circuits suit dense installations and reduce reliance on fast fans inside each miner. They also provide a defined route for collecting useful heat.

What the site needs

Match the coolant, flow and pressure to the miner. Include pumps, leak monitoring and suitable outdoor cooling. Pumps and external fans still consume power and create noise.

Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.

Power distribution and controls

Power distribution and cooling equipment must be matched to the selected hardware. The published reference configuration is summarised below.

04 / Useful heat

Give the heat a purpose.

Match heat recovery to a real local demand.

Mining heat can be useful where there is a nearby demand at a suitable temperature. A separate heat exchanger can transfer useful heat to a compatible building or process circuit.

Keep independent heat rejection available when the receiving site cannot use the heat. Any recovery plant, temperature boost and additional pumps belong in the project specification and energy budget.

Mining heat→Controlled transfer→Suitable local heat demand

05 / Plan your installation

Get your site ready.

Share your miner list and site details with our team before confirming the container configuration.

Power supply

Confirm voltage, distribution and total site demand. Include the miners, cooling equipment and other electrical loads.

Cooling requirements

Check ambient conditions, the cooling circuit and any water or immersion fluid requirements for your chosen equipment.

Delivery and access

Plan vehicle access, unloading, foundations and service clearances. Agree the delivery scope before arranging installation.

Why are two miner counts shown?

The HW7 supports different T type and 2U arrangements. These are alternative layouts. Do not combine the two capacities or assume the same rack, power and pipe schedule applies to both.

What needs to be known about the site water?

The water curtain is part of the cooling strategy. Confirm seasonal water availability, quality, treatment and drainage with the selected operating conditions before finalising the site design.

Before you order

Your questions.

Are miners included?

Confirm the supplied equipment list in your quotation. Do not assume ASIC miners, accessories or installation are included in the container price.

Will my miners fit this container?

Compatibility depends on the exact miner model, cooling method, electrical connections and configuration. Send us your proposed miner list for checking.

How are preorder dates confirmed?

Ask for the current allocation and expected dispatch window. The quoted lead time and delivery arrangements will be confirmed for your order.

06 / Compatible fleet examples

Also bought with.

Compare suitable ANTMINER families using current catalogue base values. Each card represents an alternative fleet of one model, not three fleets to combine.

These S21 Hydro examples use the standard T type layout. The alternative 242 position S23e U2H layout requires a separate miner selection. Confirm the supplied rack, PSU connectors and coolant flow before ordering.

369 miners · planning quantity

Confirm fleet availability

Bitmain Antminer S21e Hydro 288Th SHA-256 Bitcoin Miner
Bitmain
In stock#8 ROI#10 Value
Hashrate
288TH
Efficiency
17W/TH
Power
4896W
Earns/kWh
5.6p
Price · delivered
Original price was: £1,825.00.Current price is: £1,650.00.
ex VAT
Est. per month
£198.74
Container + miner hardware£695,450.00369 × £1,650.00 per miner · container £86,600.00
318 miners · planning quantity

Currently out of stock

Bitmain Antminer S21 XP Hydro 473Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
473TH
Efficiency
12W/TH
Power
5676W
Earns/kWh
7.9p
Price · delivered
£6,370.00
ex VAT
Est. per month
£326.40
Container + miner hardware£2,112,260.00318 × £6,370.00 per miner · container £86,600.00
342 miners · planning quantity

Currently out of stock

Bitmain Antminer S21+ XP Hydro 480Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
480TH
Efficiency
11W/TH
Power
5280W
Earns/kWh
8.6p
Price · delivered
Original price was: £9,468.00.Current price is: £8,200.00.
ex VAT
Est. per month
£331.23
Container + miner hardware£2,891,000.00342 × £8,200.00 per miner · container £86,600.00
How quantities, prices and earnings are calculated

Planning quantity = the lower of the supported slot count and the whole number of miners within the chosen power budget, allowing 5% above each miner's catalogue wattage. This page uses 1900kW for ANTSPACE HW7. HD5 reserves 100kW from its 1512kW normal figure; HW5 uses the older 1062kW limit until its revision is confirmed; HW7 reserves 100kW below its 2000kW cooling rating; MD5 reserves 100kW within its 1000kW container figure. These are conservative screening assumptions, not commissioned or manufacturer approved fleet sizes.

Fleet price = current unit price × quantity. Fleet gross monthly earnings = the same per miner base earnings field used by the homepage card × quantity. Hashrate and miner power also scale with quantity; efficiency and earnings per kWh remain per unit ratios. A combined hardware total is shown only where a container price is available; otherwise the container is quoted separately. No bulk discount, electrical infrastructure, delivery adjustment, cooling electricity, downtime or heat income is assumed.

Gross earnings are estimates before electricity and operating costs. Final quantities also depend on ambient temperature, coolant flow, distribution across cabinets, PSU connectors and the approved rack layout. Check stock allocation and the complete quote before ordering. This section shows compatibility examples and does not claim a purchase history.

07 / Source and quotation

Plan your project.

The equipment schedule defines the configuration supplied.

Specifications are based on the manufacturer material linked below, using the configuration and conditions shown on this page.