Skip to main content
£0.00 0

Basket

No products in the basket.

Bitmain ANTSPACE HW7 2MW Hydro Mining Container — main product view
Bitmain ANTSPACE HW7 2MW Hydro Mining Container — Main product view

BITMAIN · Mining containers

ANTSPACE HW7

Hydro mining container

November preorder

Price on request. This mining container is available by enquiry. Contact us for a quotation covering the required configuration, delivery and installation arrangements. Request a quote.

The Bitmain ANTSPACE HW7 is a 2MW hydro cooling container system for larger mining fleets. BITMAIN lists layouts for up to 396 T type miners or 242 S23e U2H miners, with a dry cooler and water curtain. Available on preorder from The Mining Shop. Contact us to confirm the layout and dispatch schedule.

Container price

Price on request

Delivery, tax treatment and equipment inclusions confirmed with your quotation.

Cooling capacity2000 kW
Miner positionsUp to 396 T type or 242 2U
CoolingHydro

01 / Technical details

Specifications at a glance.

Check the figures for ANTSPACE HW7 against your miner fleet and available site services.

Manufacturer BITMAIN
Model ANTSPACE HW7
Cooling Hydro; dry cooler with water curtain
Cooling capacity 2,000kW / 2MW heat dissipation
Miner positions Up to 396 T type or 242 2U type S23e U2H miners
Container dimensions 12,192 × 2,438 × 2,896mm (L × W × H; container only)
Input supply 380 to 480V, 50/60Hz, three phase 3P/N/PE
Rated container power 2,100kW
Maximum supported input power 2,500kW
Distribution main switch rating 1200A
Maximum supported input current 4 × 960A
Maximum current per miner slot 25A
Circulation pump ratings 2 × 30kW
Cooling fan ratings 22 × 4.1kW
Water curtain pump ratings 2 × 1.5kW
Cooler supply at 30°C ambient 35 ±1°C
Cooler supply at 50°C ambient 49 ±1°C with cooling pad enabled
Water curtain consumption 0.25 to 5.3m³/h
System coolant volume 3.2m³
Circuit connections DN125 ISO 139.7 clamp interfaces
Container shipping / operating weight 16t / 25t
Cooling unit shipping / operating weight 14t / 16t
Reference PUE 1.03 at 25°C ambient and 35°C supply liquid
Cooling noise reference 75dBA at 15m and 25°C

Manufacturer reference values. Final configuration and equipment schedule confirmed before ordering.

02 / The container

Inside the ANTSPACE HW7.

Capacity, compatibility and the details that matter when planning your installation.

A container for higher capacity hydro sites

The Bitmain ANTSPACE HW7 hydro mining container gives operators a choice of two published layouts: up to 396 T type hydro miners or 242 S23e U2H miners in the 2U format. That choice makes the intended miner fleet the starting point for planning the container and its supporting infrastructure.

Dry cooling with a water curtain

The HW7 cooling unit combines a dry cooler with a water curtain and is rated for 2,000kW of heat dissipation. Its electrical input is specified at 380 to 480V, 50/60Hz, three phase. BITMAIN lists rated container power of 2,100kW and maximum supported input power of 2,500kW, separately from the cooling rating.

Check the layout before ordering

The published miner counts describe available positions. Actual operating capacity depends on miner power demand, cooling requirements and local conditions. Confirm the precise machine format and allow for foundations, lifting access, water supply and the required clearance around the cooling equipment.

Discuss your HW7 preorder

The Mining Shop is taking enquiries for the ANTSPACE HW7 November preorder allocation. Contact us with your miner models, site details and preferred timetable to confirm the available batch, dispatch date and equipment included in the quotation.

03 / Power and cooling

Inside the infrastructure.

Distribution cabinets, PDU functions and the supporting equipment for ANTSPACE HW7.

Higher capacity distribution

The HW7 lists 1200A main switch capacity, four 960A maximum input feeds and a 25A slot ceiling. Its 2100kW rated input and 2500kW maximum input are electrical figures; the cooling unit is rated at 2000kW.

Dry cooler with water assistance

The cooling unit combines a dry cooler and water curtain. The manufacturer lists two 30kW circulation pumps, 22 cooling fans rated at 4.1kW each and two 1.5kW water curtain pumps. These are component nameplate ratings, not a promise of constant consumption.

Rack layout and controls

BITMAIN specifies either 396 T type positions or 242 S23e U2H positions. These are alternative layouts, not additive capacities. The source does not identify a smart PDU model or promise individual outlet metering; confirm those functions and the rack layout in your quotation.

Specification revisions and equipment confirmation

The current sheet gives PUE 1.03 at stated test conditions. Treat efficiency, water consumption and temperature limits as conditional reference values rather than fixed results at every site. Request the single line diagram, breaker schedule, PDU outlet model, cable list, cooling schematic and commissioning requirements for the unit supplied.

04 / Heat reuse

Put mining heat to work.

Potential applications for an engineered recovery system. Heating equipment is not included in the container price unless expressly quoted.

ANTSPACE HW7: what is supported?

The HW7 liquid loop may support a designed heat recovery system, but its current specification does not identify a supplied heat recovery package. A suitable exchanger, hydraulic separation and control strategy would need approval for the selected circuit and miners. Retain independent heat rejection for periods of low heating demand.

Miner cooling circuit→Separate heat exchanger→Heating loop or heat pump→Useful heat demand

Building and district heating

Nearby buildings or a heat network may accept recovered heat directly at suitable temperatures, or through a heat pump. MARA reports operating district heating projects in Finland; these demonstrate the application, not certification of this ANTSPACE model.

Read the district heating example ↗

Greenhouses and growing spaces

A greenhouse with a suitable heating circuit is a potential heat user. GDA has researched the use of mining heat for greenhouse farming in Sweden. A project needs a seasonal heat demand calculation rather than a fixed area per container claim.

Read the greenhouse project ↗

Pool and process water preheating

As a project concept, recovered heat could preheat pool or process water through an isolated secondary circuit. The usable temperature, exchanger materials, water treatment and backup heating must be designed for that application.

What a heat recovery design needs to establish

Confirm miner supply and return temperature limits, flow, pressure loss, fluid compatibility, heat exchanger duty, the receiving system temperature and year round demand. Add bypass controls and retain sufficient cooling for summer or loss of heat demand. A heat pump may be needed for a higher delivery temperature. The cooling rating is not guaranteed recoverable heat, and no heat sales or heating savings are included in the earnings below.

BITMAIN offers waste heat heating design services. Obtain approval for the exact container revision before modifying its circuit.

05 / Plan your installation

Get your site ready.

Share your miner list and site details with our team before confirming the container configuration.

Power supply

Confirm voltage, distribution and total site demand. Include the miners, cooling equipment and other electrical loads.

Cooling requirements

Check ambient conditions, the cooling circuit and any water or immersion fluid requirements for your chosen equipment.

Delivery and access

Plan vehicle access, unloading, foundations and service clearances. Agree the delivery scope before arranging installation.

Why are two miner counts shown?

The HW7 supports different T type and 2U arrangements. These are alternative layouts. Do not combine the two capacities or assume the same rack, power and pipe schedule applies to both.

What needs to be known about the site water?

The water curtain is part of the cooling strategy. Confirm seasonal water availability, quality, treatment and drainage with the selected operating conditions before finalising the site design.

Before you order

Your questions.

Are miners included?

Confirm the supplied equipment list in your quotation. Do not assume ASIC miners, accessories or installation are included in the container price.

Will my miners fit this container?

Compatibility depends on the exact miner model, cooling method, electrical connections and configuration. Send us your proposed miner list for checking.

How are preorder dates confirmed?

Ask for the current allocation and expected dispatch window. The quoted lead time and delivery arrangements will be confirmed for your order.

06 / Compatible fleet examples

Also bought with.

Compare suitable ANTMINER families using current catalogue base values. Each card represents an alternative fleet of one model, not three fleets to combine.

These S21 Hydro examples use the standard T type layout. The alternative 242 position S23e U2H layout requires a separate miner selection. Confirm the supplied rack, PSU connectors and coolant flow before ordering.

369 miners · planning quantity

Confirm fleet availability

SHA-256
·
BTC
SHA-256 algorithm
Bitmain Antminer S21e Hydro 288Th SHA-256 Bitcoin Miner
Bitmain
Hashrate
288TH
Efficiency
17W/TH
Power
4896W
Earns/kWh
8.4p
Price · delivered
£1,825.00
ex VAT
Est. per month
£301.66
Miner hardware subtotal£673,425.00369 × £1,825.00 per miner · container quoted separately
318 miners · planning quantity

Currently out of stock

Bitmain Antminer S21 XP Hydro 473Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
473TH
Efficiency
12W/TH
Power
5676W
Earns/kWh
12.0p
Price · delivered
£6,370.00
ex VAT
Est. per month
£495.44
Miner hardware subtotal£2,025,660.00318 × £6,370.00 per miner · container quoted separately
342 miners · planning quantity

Currently out of stock

Bitmain Antminer S21+ XP Hydro 480Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
480TH
Efficiency
11W/TH
Power
5280W
Earns/kWh
13.1p
Price · delivered
Original price was: £9,468.00.Current price is: £8,200.00.
ex VAT
Est. per month
£502.77
Miner hardware subtotal£2,804,400.00342 × £8,200.00 per miner · container quoted separately
How quantities, prices and earnings are calculated

Planning quantity = the lower of the supported slot count and the whole number of miners within the chosen power budget, allowing 5% above each miner's catalogue wattage. This page uses 1900kW for ANTSPACE HW7. HD5 reserves 100kW from its 1512kW normal figure; HW5 uses the older 1062kW limit until its revision is confirmed; HW7 reserves 100kW below its 2000kW cooling rating; MD5 reserves 100kW within its 1000kW container figure. These are conservative screening assumptions, not commissioned or manufacturer approved fleet sizes.

Fleet price = current unit price × quantity. Fleet gross monthly earnings = the same per miner base earnings field used by the homepage card × quantity. Hashrate and miner power also scale with quantity; efficiency and earnings per kWh remain per unit ratios. A combined hardware total is shown only where a container price is available; otherwise the container is quoted separately. No bulk discount, electrical infrastructure, delivery adjustment, cooling electricity, downtime or heat income is assumed.

Gross earnings are estimates before electricity and operating costs. Final quantities also depend on ambient temperature, coolant flow, distribution across cabinets, PSU connectors and the approved rack layout. Check stock allocation and the complete quote before ordering. This section shows compatibility examples and does not claim a purchase history.

Technical references

Check the supplied configuration.

BITMAIN ANTSPACE HW7 specification and image gallery ↗

Supporting ANTSPACE HW7 documentation ↗

Research checked 24 September 2026. Images show manufacturer reference configurations. Request the serial number specific equipment schedule and drawings with your quotation.