MINING BUNDLE
220x Antminer S21 319TH + ANTSPACE HD5 Container · T-type
SHA-256 · 70.18 PH/s
220 miners · Hydro cooling · With container
In stock

Catalogue preview — this bundle is not available to order yet.
- Hashrate
- 70.18 PH/s319 TH/s each
- Algorithm
- SHA-256
- Efficiency
- 16W/TH
- Power
- 1.12MW5.1kW each
- Miner Load
- 1.12MWAuxiliary power pending
- Earns/kWh
- Pending
Total Saving £86,890.00
Component Miner Rankings
These are the included individual miners’ existing ranks. Bundle economics use the complete configuration price, delivery, discount and auxiliary power. Mixed fleets show an average component percentage score, with the individual ranks in its breakdown.
Selected Equipment Schedule
220 miners · Pending operating load. Only the following quantities and products are included in this configuration.
| Equipment | Quantity | Role |
|---|---|---|
| Bitmain Antminer S21 Hydro 319Th SHA-256 Bitcoin Miner | 220 | Miner |
| Bitmain ANTSPACE HD5 1.5MW Hydro Mining Container | 1 | Infrastructure |
Container Layout · T-type.
Container Planning & Headroom
Provisional maximum per container: 220 miners, in 2 equal groups. Quantities allow 5% above listed miner power and reserve 10% of reference cooling and electrical capacity, and of flow where published. This is a planning allowance, not installation approval.
- Miner Design Load
- 1.18MW
- Auxiliary Electrical Allowance
- 180kW
- Cooling Headroom
- 220.98kW
- Coolant Flow Allowance
- 132.00 m³/h
Auxiliary allowances are conservative design bounds, not average electricity consumption. Running costs remain unconfirmed until the complete load schedule is supplied.
Normal stock operation, no overclocking. Hydro inlet at or below 35 C. Site ambient, fluid, pressure, branch circuits and delivered revision require confirmation.
1512kW is a deliberately conservative planning ceiling, not a claim about gross electrical capacity. Budget the separate container/tower bounds of 100+80kW without claiming concurrent measured draw; possible overlap remains unresolved. Only the container 100kW bound is charged to the liquid circuit. 73.9m3/h per side; equal A/B allocation.
Individual Miner Connection
The miner maximum input current exceeds the published bay reference. Confirm a compatible delivered branch/PDU revision; reducing miner quantity does not resolve this.
- Miner Maximum Input
- 12A
- Published Bay Reference
- 10A
Miner electrical specification
Manufacturer Equipment Reference
Container with two distribution cabinets and two cooling circuits, matched 1500kW dry tower (750kW per side), controls and DN100 PN16 connections. The manual describes connecting pipework; the delivered packing list must establish its supply.
Outstanding Supplier Checks
- Confirm the delivered manual revision and that the priced package includes the matched tower, pumps, connecting pipework and coolant.
- Reconcile the 100kW container and 80kW tower limits before treating their sum as actual auxiliary consumption.
- The S21 Hydro V4.0.14 guide specifies 12A maximum versus the 10A bay reference. Obtain a matching delivered branch/PDU revision and circuit/connector schedule; reducing fleet quantity does not resolve this. Confirm cooling duty, site supply and pump flow at operating pressure.
Price Breakdown & Volume Discount
- Miner Subtotal
- £535,260.00
- Infrastructure Subtotal
- £68,100.00
- Miner Discount
- 15%
- Recorded AER Delivery Allowances
- £44,500.00
The volume discount applies once to current published miner prices, including their embedded delivery allowance. Freight enters the complete package total once. Infrastructure is not discounted. Existing AER £10 rounding applies. Unconfirmed amounts are indicative, not an orderable offer.
Power Consumption & Installation Requirements
- Miner Load
- 1.12MW
- Auxiliaries
- Unconfirmed
- Known Load Only
- 1.12MW
- Energy per 24 Hours
- 26,949.12kWh
Miner-only consumption is shown while auxiliary power is unconfirmed. Pumps, fans, controls and other site loads must be added; this is not a complete operating total.
Mining Earnings & Block Odds
Scenario, odds & assumptions
Constant-condition scenario, not a forecast. 100% operating time, £0.000/kWh, 2% pool service fee and 0% Solo service fee. Fees are editable assumptions; confirm your chosen provider’s charges. Network transaction rewards are included in the shared source estimate.
Operating power Pending includes Pending auxiliaries. Miner quantities are fixed. Auxiliary inputs must cover the listed cooling equipment.
Bitcoin equivalent is a display conversion of the selected mining routes, not a claim that the hardware mines Bitcoin. Recorded Bitcoin price £62,529.12 at 2026-10-21T11:03:09+00:00.
Auto selects the highest expected annual return after the entered fees and operating electricity for each algorithm. Equipment cost is fixed for the selected configuration. A higher expected Solo return does not mean a reliable payout.
- Quai Expected Blocks / Year
- 14,281,677.996632
- At Least One Block
- ≈100%
- No Blocks
- <0.0001%
- Block Value
- £0.06
Block probabilities use this fleet’s actual hashrate over the selected timeframe. Fractional expected blocks are a statistical average, not part of a block paid to you.
Excludes hosting, maintenance, taxes, finance and other operating charges not explicitly entered. Prices, difficulty, rewards and uptime can change. Network inputs: . Calculated .
| Asset / Mode | Expected Earnings |
|---|---|
| SHA-256 · Quai · Solo | £829,202.99 |
| SHA-256 · eCash · Solo | £802,456.91 |
| SHA-256 · Fractal Bitcoin · Solo | £742,074.73 |
| SHA-256 · Bitcoin Cash · Solo | £741,685.16 |
| SHA-256 · Bitcoin Cash · Pool | £732,697.37 |
| SHA-256 · Bitcoin · Solo | £723,296.42 |
| SHA-256 · eCash · Pool | £719,991.63 |
| SHA-256 · Fractal Bitcoin · Pool | £694,423.30 |
| SHA-256 · Bitcoin · Pool | £692,540.97 |
| SHA-256 · Bitcoin · Pool | £691,286.08 |
| SHA-256 · Quai · Pool | £678,580.35 |
| SHA-256 · DigiByte · Pool | £522,346.87 |
| SHA-256 · DigiByte · Solo | £499,646.83 |
Equipment Scope & Site Requirements
The selected equipment schedule itemises the miners and container(s). Manufacturer system reference: Container with two distribution cabinets and two cooling circuits, matched 1500kW dry tower (750kW per side), controls and DN100 PN16 connections. The manual describes connecting pipework; the delivered packing list must establish its supply. The saved price record does not independently confirm the supplied packing list. Final tower, pump, controls, pipework, miner connections and coolant inclusions require supplier confirmation.
Site works, upstream electrical supply, networking, commissioning, maintenance and any equipment not itemised.
- Miners and exact supply batch — see the itemised schedule.
- Rack, tank or container and chassis compatibility — included only if expressly itemised; otherwise excluded.
- Pumps and coolant distribution — included only if expressly itemised; otherwise excluded.
- Dry cooler or heat exchanger — included only if expressly itemised; otherwise excluded.
- Immersion fluid or approved hydro coolant — included only if expressly itemised; otherwise excluded.
- Pipework, valves and connections — included only if expressly itemised; otherwise excluded.
- Electrical distribution, protection and cabling — included only if expressly itemised; otherwise excluded.
- Networking, commissioning and site work — included only if expressly itemised; otherwise excluded.
Availability
This configuration is a draft and is not available to buy yet. The included equipment, pricing and stock must be complete before it is listed for sale.
Outstanding Configuration Checks
- State auxiliary power and reserve explicitly.
- Complete-package delivery allowance is missing.
- Infrastructure capacities need verification.
- Auxiliary load must include the infrastructure auxiliaries.
- Itemise the complete auxiliary load, including pumps, fans, coolers and controls.
- The complete auxiliary schedule must match the reviewed per-module loads; external loads cannot bypass module capacity checks.
- Electrical supply capacity is missing.
- Record the installation electrical reserve explicitly.
- Exact equipment fit and installation design need confirmation.
- Record the reviewed electrical design and its evidence.
- Record the reviewed cooling design and its evidence.
- Record the reviewed ancillaries design and its evidence.
- The miner maximum input current exceeds the published bay reference. Confirm a compatible delivered branch/PDU revision; reducing miner quantity does not resolve this.
- No valid per-module placement was found for the fleet and cooling limits.
- Planning headroom is provisional; confirm the supplied revision, site conditions and complete auxiliary schedule before installation approval.
- The component specification or price changed; review this package.