Skip to main content
£0.00 0

Basket

No products in the basket.

Bitmain ANTSPACE HD5 1.5MW Hydro Mining Container product view 1
Bitmain ANTSPACE HD5 1.5MW Hydro Mining Container product view 1

BITMAIN · Mining containers

ANTSPACE HD5

Hydro mining container

In stock

Price on request. This mining container is available by enquiry. Contact us for a quotation covering the required configuration, delivery and installation arrangements. Request a quote.

The ANTSPACE HD5 is a hydro mining container paired with an external dry cooler. Its published 1.5 MW cooling duty is separate from the electrical input of the miners and cooling equipment.

Container price

£68,600.00

Delivery, tax treatment and equipment inclusions confirmed with your quotation.

Cooling capacity1500 kW
Miner positions308 reference positions
CoolingHydro

01 / Technical details

Specifications at a glance.

Check the figures for ANTSPACE HD5 against your miner fleet and available site services.

Cooling duty1500 kW nominal
Positions308 reference positions
Container operating input1512 kW in V1
Maximum input1665 kW in V1
Supply400 V ±5%, 50 or 60 Hz
Main switches4 × 1200 A
Container shipping mass11000 kg
Container operating mass17200 kg in V1
Tower supply temperature35°C at 30°C ambient
Release year2025
Headroom reference (11 October 2026)Manual v2.1.6: two 750kW cooling sides; 1500kW total at the specified ambient and coolant temperatures.
Coolant flow reference73.9m3/h per side at the factory setting; 67.2m3/h is also listed for the 140-position layout.
Auxiliary power referenceContainer no-load <=100kW; tower <=80kW. Their overlap and concurrent operating draw need confirmation. Planning reserves both bounds.

Manufacturer reference values. Final configuration and equipment schedule confirmed before ordering.

02 / The equipment

Built around the site.

Choose the configuration around the miner fleet and available site services.

Inside the installation

The ANTSPACE HD5 is a hydro mining container paired with an external dry cooler. Its published 1.5 MW cooling duty is separate from the electrical input of the miners and cooling equipment.

The HD5 is intended for a fleet of compatible hydro miners. Coolant carries heat from the machines to the outdoor cooler, where fans discharge it into the air.

The supplied revision matters. The January 2025 manual and later catalogue specifications differ on maximum input and operating weight. The order specification should identify the container and cooler together before freight or site capacity is agreed.

Defining the scope

The quotation identifies the supplied equipment, compatible miners and required connections. Final capacity depends on the selected hardware and site conditions.

Cooling explained

Show how the cooling works

See how this cooling method moves heat away from the mining hardware.

Liquid through the miner

Coolant flows through passages inside a compatible hydro miner. It carries heat into pipework and onward to the cooling equipment. The electronics are not submerged.

Why choose hydro

Liquid circuits suit dense installations and reduce reliance on fast fans inside each miner. They also provide a defined route for collecting useful heat.

What the site needs

Match the coolant, flow and pressure to the miner. Include pumps, leak monitoring and suitable outdoor cooling. Pumps and external fans still consume power and create noise.

Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.

Power distribution and controls

Power distribution and cooling equipment must be matched to the selected hardware. The published reference configuration is summarised below.

  • Supply: 400 V ±5%, 50 or 60 Hz
  • Main switches: 4 × 1200 A
  • Tower supply temperature: 35°C at 30°C ambient

04 / Useful heat

Give the heat a purpose.

Match heat recovery to a real local demand.

Mining heat can be useful where there is a nearby demand at a suitable temperature. A separate heat exchanger can transfer useful heat to a compatible building or process circuit.

Keep independent heat rejection available when the receiving site cannot use the heat. Any recovery plant, temperature boost and additional pumps belong in the project specification and energy budget.

Mining heat→Controlled transfer→Suitable local heat demand

05 / Plan your installation

Get your site ready.

Share your miner list and site details with our team before confirming the container configuration.

Power supply

Confirm voltage, distribution and total site demand. Include the miners, cooling equipment and other electrical loads.

Cooling requirements

Check ambient conditions, the cooling circuit and any water or immersion fluid requirements for your chosen equipment.

Delivery and access

Plan vehicle access, unloading, foundations and service clearances. Agree the delivery scope before arranging installation.

Can every hydro miner use an HD5 position?

No. The current reference schedule lists 10 A per position. Match the exact miner PSU, connector and operating mode to that limit, as well as the total cooling duty. A physically compatible rack position is only one part of the selection.

How would the HD5 support useful heat?

The listed plate exchanger interface provides a starting point for a separate recovery circuit. A pool or greenhouse needs its own exchanger selection, controls and demand assessment. Keep the dry cooler available when the heat user is offline.

Before you order

Your questions.

Are miners included?

Confirm the supplied equipment list in your quotation. Do not assume ASIC miners, accessories or installation are included in the container price.

Will my miners fit this container?

Compatibility depends on the exact miner model, cooling method, electrical connections and configuration. Send us your proposed miner list for checking.

How are preorder dates confirmed?

Ask for the current allocation and expected dispatch window. The quoted lead time and delivery arrangements will be confirmed for your order.

06 / Compatible fleet examples

Also bought with.

Compare suitable ANTMINER families using current catalogue base values. Each card represents an alternative fleet of one model, not three fleets to combine.

These examples use the S19 Pro Hydro j0 10 family, whose manufacturer sheet specifies 10A per phase. Newer S21 Hydro variants with a 12A maximum input are excluded from these 10A position examples. Confirm the exact PSU, connectors, rack fit and coolant flow before placing a fleet order. These catalogue models are currently out of stock; the totals are planning comparisons, not an offer of immediate fleet availability. Manufacturer electrical specification

247 miners · planning quantity

Currently out of stock

Bitmain Antminer S19 Pro Hydro 184Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
184TH
Efficiency
29.5W/TH
Power
5428W
Earns/kWh
3.2p
Price · delivered
£2,100.00
ex VAT
Est. per month
£128.22
Container + miner hardware£587,300.00247 × £2,100.00 per miner · container £68,600.00
257 miners · planning quantity

Currently out of stock

Bitmain Antminer S19 Pro Hydro 177Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
177TH
Efficiency
29.5W/TH
Power
5222W
Earns/kWh
3.2p
Price · delivered
£1,978.00
ex VAT
Est. per month
£123.35
Container + miner hardware£576,946.00257 × £1,978.00 per miner · container £68,600.00
268 miners · planning quantity

Currently out of stock

Bitmain Antminer S19 Pro Hydro 170Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
170TH
Efficiency
29.5W/TH
Power
5015W
Earns/kWh
3.2p
Price · delivered
£2,200.00
ex VAT
Est. per month
£118.47
Container + miner hardware£658,200.00268 × £2,200.00 per miner · container £68,600.00
How quantities, prices and earnings are calculated

Planning quantity = the lower of the supported slot count and the whole number of miners within the chosen power budget, allowing 5% above each miner's catalogue wattage. This page uses 1412kW for ANTSPACE HD5. HD5 reserves 100kW from its 1512kW normal figure; HW5 uses the older 1062kW limit until its revision is confirmed; HW7 reserves 100kW below its 2000kW cooling rating; MD5 reserves 100kW within its 1000kW container figure. These are conservative screening assumptions, not commissioned or manufacturer approved fleet sizes.

Fleet price = current unit price × quantity. Fleet gross monthly earnings = the same per miner base earnings field used by the homepage card × quantity. Hashrate and miner power also scale with quantity; efficiency and earnings per kWh remain per unit ratios. A combined hardware total is shown only where a container price is available; otherwise the container is quoted separately. No bulk discount, electrical infrastructure, delivery adjustment, cooling electricity, downtime or heat income is assumed.

Gross earnings are estimates before electricity and operating costs. Final quantities also depend on ambient temperature, coolant flow, distribution across cabinets, PSU connectors and the approved rack layout. Check stock allocation and the complete quote before ordering. This section shows compatibility examples and does not claim a purchase history.

07 / Source and quotation

Plan your project.

The equipment schedule defines the configuration supplied.

Specifications are based on the manufacturer material linked below, using the configuration and conditions shown on this page.