Choosing the format
Higher density makes the final miner selection especially important. The published rack schedule and platform headline use different totals, so the quotation should establish the usable IT load and auxiliary demand separately.
Power Mining · Mining systems
Hydro Mining Container
Subject to quotationMake the most of a larger site connection with the Power Mining 45 ft HC 2.5 MW. Its denser rack arrangement suits projects that need to plan cooling, distribution and heat export as one system.
Equipment price
01 / Technical reference
Match the delivered revision, electrical supply and cooling design to your selected fleet.
| Platform rating | 2500 kW; rack schedule totals 2400 kW |
|---|---|
| Auxiliary allowance | 150 kW; confirm total service demand |
| Racks | 10 × 24 positions |
| Input | 415 V three phase; 2 × 2500 A plus 200 A auxiliary |
| PDU | 400 A three phase; SA2 30 four pin sockets |
| Coolant | Water and glycol; 2400 L/min total |
| Dimensions | 13.72 × 2.44 × 2.89 m |
| Weight | 17,500 kg net; 21,000 kg operating |
Reference figures are subject to the conditions and revision stated by the manufacturer.
02 / A place in your project
Start with your incoming power and intended miner family. Then choose the enclosure, rack layout and cooling arrangement that suit the site.
Higher density makes the final miner selection especially important. The published rack schedule and platform headline use different totals, so the quotation should establish the usable IT load and auxiliary demand separately.
Build the quotation around the miner model, site location, available power and cooling conditions. Agree the equipment schedule, delivery arrangements and commissioning responsibilities before placing an order.
03 / Power and plant
Power distribution, controls and cooling equipment determine how the equipment works as an installation.
The PDU layout uses a dedicated three phase supply for the hydro fleet. Confirm the precise Whatsminer M63 variant, factory power lead and socket pinout before allocating circuits. The manufacturer lists redundant pumps, BMS control and temperature, leak, smoke and humidity sensing; the final schedule should identify alarm actions and remote access.
Confirm the incoming supply, earthing arrangement, protective devices and miner connectors. A circuit rating or an empty socket does not establish the number of miners that can run continuously.
Allow access to electrical panels and cooling components, with a clear isolation procedure. Include the monitoring network and alarm response in the operating plan.
04 / Useful heat
These are applications to assess with a thermal designer, not promised outputs or evidence that recovery equipment is included.
Power Mining offers heat exchangers and heat meters on request. A separately designed heating loop could supply a greenhouse, a swimming pool or a district heating return circuit. Match the miner outlet temperature to the heat customer and retain independent heat rejection for summer or demand interruptions. A warmer water target must stay within the selected miner warranty conditions.
Assess whether a separate water circuit can accept useful heat before its normal heating stage.
Match the heating circuit to the crop schedule, seasonal demand and available water temperature.
Retain independent cooling when the receiving building or process cannot accept heat. Account for pumps, fans and any temperature boost in the project economics.
05 / Before delivery
A clear specification prevents the site and the equipment from being designed in isolation.
Ask The Mining Shop to check the rack drawing, cooling duty, service clearance and electrical schedule against your intended fleet. Manufacturer photography shows a representative hydro installation; it does not establish the exact chassis or supplied options of every configuration.
Agree the foundation, delivery route, lifting plan and service clearances for the supplied equipment.
Confirm physical fit, connection type and continuous electrical load before committing to a fleet quantity.
Define who installs, tests and commissions each part of the system, including external plant and monitoring.
Project questions
Miners are separate unless expressly included in the written equipment schedule.
Availability and lead time require confirmation. This page does not represent confirmed stock allocation.
Price on application. Ask The Mining Shop for a quotation based on your miner model, intended quantity, site location and cooling requirements.
The quotation will identify the supplied equipment, optional components, delivery and installation responsibilities. Mining hardware is included only when expressly listed.
06 / Fleet planning
Each fleet example is an alternative, not an additional group to combine. The final miner order needs an approved configuration.
Power Mining names the Whatsminer M63 family as a hydro option. These examples use native M63 hydro miners. Confirm the supplied rack layout, miner revision, cable assemblies and circuit schedule before ordering. These are planning combinations, not a record of previous purchases.
Confirm fleet availability
Confirm fleet availability
Quantity is calculated separately for each of 10 racks, using up to 24 positions and a 240 kW reference miner budget per rack. The calculation allows 5% above catalogue miner wattage, then multiplies the whole number of miners per rack by the rack count. Auxiliary plant is additional. The 2.5 MW listing uses the lower 2.4 MW total implied by its rack figures.
Miner cost and gross monthly earnings use current catalogue unit values multiplied by quantity. Earnings use the same base field as the homepage cards, before electricity, operating costs and downtime. No heat income or bulk discount is assumed. The infrastructure is quoted separately. These totals are illustrations, not guarantees of income or availability.
07 / Source and quotation
Manufacturer information is the starting point. The written quotation defines the supplied configuration.
Power Mining began manufacturing Bitcoin mining containers in 2017. Its equipment range has expanded to include remotely managed power distribution units and assembled open-source home miners such as Bitaxe and NerdQAxe. The company works across both commercial mining infrastructure and compact equipment for individual users. Its container systems, electrical distribution products and home miners serve different installation needs, with specifications defined for each product and configuration.
Manufacturer images are reference illustrations or photographs. Equipment, accessories and layout must be confirmed in the final quotation.