Choosing the format
The choice between standard and HC layouts affects more than the number of shelves. It changes the reference power demand, network equipment and incoming distribution, so the container and fleet should be specified together.
Power Mining · Mining systems
Air Mining Container
Subject to quotationBring a larger Antminer air fleet into one organised installation. The Power Mining 40 ft container combines full length racking with separate S19 and S21 layout options, giving operators a clear starting point for a commercial expansion.
Equipment price
01 / Technical reference
Match the delivered revision, electrical supply and cooling design to your selected fleet.
| Standard layout | 324 S19 or 288 S21 positions |
|---|---|
| HC layout | 378 S19 or 336 S21 positions |
| Reference power | Standard 1134 / 1065.6 kW; HC 1323 / 1243.2 kW for S19 / S21 |
| Distribution | Standard 2 × 1000 / 1250 A; HC 2 × 1250 / 1600 A for S19 / S21 |
| PDU | Three phase 63 A main breakers; S21 schedule lists 20 A per socket |
| Filtration | G4 or M5 options |
| Network | 15 or 16 switches of 24 ports |
| Dimensions | 12.19 × 2.44 × 2.89 m |
Reference figures are subject to the conditions and revision stated by the manufacturer.
02 / A place in your project
Start with your incoming power and intended miner family. Then choose the enclosure, rack layout and cooling arrangement that suit the site.
The choice between standard and HC layouts affects more than the number of shelves. It changes the reference power demand, network equipment and incoming distribution, so the container and fleet should be specified together.
Build the quotation around the miner model, site location, available power and cooling conditions. Agree the equipment schedule, delivery arrangements and commissioning responsibilities before placing an order.
03 / Power and plant
Power distribution, controls and cooling equipment determine how the equipment works as an installation.
The dual incoming feeds need an agreed distribution design with enough continuous capacity for miners and auxiliaries. Check the power connectors and per circuit protection against the exact miner model. Optional power meters and a remote main input switch can be included in the equipment discussion.
Confirm the incoming supply, earthing arrangement, protective devices and miner connectors. A circuit rating or an empty socket does not establish the number of miners that can run continuously.
Allow access to electrical panels and cooling components, with a clear isolation procedure. Include the monitoring network and alarm response in the operating plan.
04 / Useful heat
These are applications to assess with a thermal designer, not promised outputs or evidence that recovery equipment is included.
An engineered exhaust collection system could send useful warm air to a neighbouring building or drying process. Keep pressure losses within the ventilation design and provide an outdoor discharge route when heat demand falls. Factory intake recirculation is a separate function.
Assess a controlled supply of warm air to an adjacent workspace, with filtration and an outdoor discharge route.
Compare the required air temperature and cleanliness with the exhaust stream before designing a drying application.
Retain independent cooling when the receiving building or process cannot accept heat. Account for pumps, fans and any temperature boost in the project economics.
05 / Before delivery
A clear specification prevents the site and the equipment from being designed in isolation.
A full length container needs an access plan for unloading and ongoing servicing. Confirm any capacity reduction caused by recirculation equipment before placing a miner order.
Agree the foundation, delivery route, lifting plan and service clearances for the supplied equipment.
Confirm physical fit, connection type and continuous electrical load before committing to a fleet quantity.
Define who installs, tests and commissions each part of the system, including external plant and monitoring.
Project questions
Miners are separate unless expressly included in the written equipment schedule.
Availability and lead time require confirmation. This page does not represent confirmed stock allocation.
Price on application. Ask The Mining Shop for a quotation based on your miner model, intended quantity, site location and cooling requirements.
The quotation will identify the supplied equipment, optional components, delivery and installation responsibilities. Mining hardware is included only when expressly listed.
06 / Fleet planning
Each fleet example is an alternative, not an additional group to combine. The final miner order needs an approved configuration.
The reference capacity is 288 to 378 depending on layout. A named family or rack count does not confirm compatibility with every model in the catalogue.
We will confirm miner revision, connections, cooling requirements and supported quantity before showing a combined price. Earnings totals need an identified miner and a current base estimate.
07 / Source and quotation
Manufacturer information is the starting point. The written quotation defines the supplied configuration.
Power Mining began manufacturing Bitcoin mining containers in 2017. Its equipment range has expanded to include remotely managed power distribution units and assembled open-source home miners such as Bitaxe and NerdQAxe. The company works across both commercial mining infrastructure and compact equipment for individual users. Its container systems, electrical distribution products and home miners serve different installation needs, with specifications defined for each product and configuration.
Manufacturer images are reference illustrations or photographs. Equipment, accessories and layout must be confirmed in the final quotation.