Digital Shovel NanoPOD Container

Air mining container

Subject to quotation

The NanoPOD is a compact mining pod rated up to 120 kW. Current layouts hold 27 S19 miners or 35 Whatsminer units, depending on the hardware selected.

Equipment price

Price on application

The current manufacturer page shows approximately $24,900; currency and delivered configuration need confirmation.

Reference capacityUp to 120 kW
Miner positions27 S19 or 35 Whatsminer reference
CoolingAir

01 / Technical reference

The pod, in numbers.

Match the delivered revision, electrical supply and cooling design to your selected fleet.

Electrical ratingUp to 120 kW
Current layouts27 S19 or 35 Whatsminer
Fans6 × 2100 CFM
Nominal fan sum12600 CFM, approximately 21408 m³/h
Filters6, MERV 5 to 13
Supply optionsSingle phase 200 to 240 V or three phase 240 to 415 V
ControlsSmart circuits and automatic fans
Manufacturer announcement25 July 2023

Reference figures are subject to the conditions and revision stated by the manufacturer.

02 / A place in your project

Make room for your mining fleet.

A pod gives your miners a defined home. Compare the footprint, outlet load and airflow with the space and power you have available.

Digital Shovel NanoPOD side view showing ventilation and electrical connections
Manufacturer photograph showing the NanoPOD ventilation hoods and connection side. Confirm the delivered electrical configuration.

Choosing the format

Six fans draw air through replaceable filters. Smart circuit control and automatic fan management provide local monitoring of the installation.

Defining the scope

Build the quotation around the miner model, site location, available power and cooling conditions. Agree the equipment schedule, delivery arrangements and commissioning responsibilities before placing an order.

Cooling explained

Show how the cooling works

See how this cooling method moves heat away from the mining hardware.

Air through the machines

Fans move air through the miners, collecting heat before discharging it outside. A clear path between the filtered inlet and exhaust helps prevent hot air returning to the machines.

Why choose air

The hardware remains directly accessible, and standard air cooled miners can be serviced without draining a liquid circuit. Filters can be selected for the site environment.

What the site needs

Size ventilation for the fleet and local temperature. Consider dust, filter resistance and sound at the site boundary. The sum of fan catalogue ratings is not a measurement of installed airflow.

Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.

Power distribution and controls

Power distribution and cooling equipment must be matched to the selected hardware. The published reference configuration is summarised below.

  • Supply options: Single phase 200 to 240 V or three phase 240 to 415 V
  • Controls: Smart circuits and automatic fans

04 / Useful heat

Give the heat a purpose.

These are applications to assess with a thermal designer, not promised outputs or evidence that recovery equipment is included.

Mining heat can be useful where there is a nearby demand at a suitable temperature. Warm exhaust air may suit an engineered ventilation or drying application.

Keep independent heat rejection available when the receiving site cannot use the heat. Any recovery plant, temperature boost and additional pumps belong in the project specification and energy budget.

Mining heat→Controlled air handling→Suitable local heat demand

Workshop warmth

Assess a controlled supply of warm air to an adjacent workspace, with filtration and an outdoor discharge route.

Drying space

Compare the required air temperature and cleanliness with the exhaust stream before designing a drying application.

Seasonal control

Retain independent cooling when the receiving building or process cannot accept heat. Account for pumps, fans and any temperature boost in the project economics.

05 / Before delivery

Plan the pod installation.

A clear specification prevents the site and the equipment from being designed in isolation.

Plan the foundation, lifting route, service access, incoming power and external cooling together. Component weights and dimensions refer to the named parts and fill conditions, rather than automatically describing a complete operating installation.

Site and access

Agree the foundation, delivery route, lifting plan and service clearances for the supplied equipment.

Miner selection

Confirm physical fit, connection type and continuous electrical load before committing to a fleet quantity.

Commissioning

Define who installs, tests and commissions each part of the system, including external plant and monitoring.

Project questions

Clear from the start.

Are miners included?

Miners are separate unless expressly included in the written equipment schedule.

Is this available immediately?

Availability and lead time require confirmation. This page does not represent confirmed stock allocation.

What does the price cover?

The written quotation confirms the supplied equipment, miner quantity where included, freight, tax treatment and commissioning responsibilities. Availability and dispatch timing are confirmed for the order.

06 / Fleet planning

Also bought with.

Each fleet example is an alternative, not an additional group to combine. The final miner order needs an approved configuration.

Match the miner first

The reference capacity is 27 S19 or 35 Whatsminer reference. A named family or rack count does not confirm compatibility with every model in the catalogue.

Request a matched fleet quotation

We will confirm miner revision, connections, cooling requirements and supported quantity before showing a combined price. Earnings totals need an identified miner and a current base estimate.

07 / Source and quotation

Plan your Digital Shovel project.

Manufacturer information is the starting point. The written quotation defines the supplied configuration.

Specifications are based on the manufacturer material linked below, using the configuration and conditions shown on this page.

Manufacturer images are reference illustrations or photographs. Equipment, accessories and layout must be confirmed in the final quotation.