Skip to main content
£0.00 0

Basket

No products in the basket.

DCX ICP15 Dry Cooler — main product view
DCX ICP15 Dry Cooler — Main product view

DCX · Mining systems

DCX ICP15 Dry Cooler

Dry Cooler

Subject to quotation

The DCX ICP15 Dry Cooler rejects heat from a liquid cooling circuit to the outdoor air. Its published duty at 35°C ambient is 15.87 kW.

Equipment price

Price on application
Reference capacity15.87 kW at 35°C ambient
Selection basisSized by heat load
CoolingDry cooler

01 / Technical reference

Size the system correctly.

Match the delivered revision, electrical supply and cooling design to your selected fleet.

Duty at 35°C ambient15.87 kW
Duty at 25°C ambient21 kW
Website envelope875 W × 460 D × 665 H mm
Fans1
Maximum electrical input1.1 kW on web specification
Supply230 to 240 V, single phase, 50 or 60 Hz
ConnectionsDN25
Listed fluid flow0.65 m³/h, 10.83 L/min derived
Pressure drop0.34 bar, not working pressure
Fluid temperatures60°C and 40°C on web specification
Dry mass40 kg

Reference figures are subject to the conditions and revision stated by the manufacturer.

02 / A place in your project

Connect the cooling circuit.

A tank rating and a cooler rating describe different parts of the system. Match the fluid, flow, ambient temperature and miner heat load before ordering.

DCX ICP15 Dry Cooler — product view 3
DCX ICP15 Dry Cooler — Product view 3

Choosing the format

Fans move air through the coil while liquid carries heat from the mining installation. Available cooling duty depends on ambient temperature, fluid temperature and flow.

Defining the scope

Build the quotation around the miner model, site location, available power and cooling conditions. Agree the equipment schedule, delivery arrangements and commissioning responsibilities before placing an order.

Cooling explained

Show how the cooling works

Follow the heat from the liquid circuit to the outdoor air.

Heat from liquid to air

Warm fluid passes through a finned coil. Fans draw outdoor air across it, carrying away heat before the cooled fluid returns to the mining installation.

Why use a dry cooler

A suitable dry cooler can reject heat without evaporating process water during normal dry operation. It can serve a compatible hydro circuit or the secondary loop of an immersion system.

What the site needs

Select the duty at the local design temperature and with the correct fluid and flow. Hot weather reduces the cooling margin. Water assisted or hybrid modes have separate requirements.

Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.

Power distribution and controls

Power distribution and cooling equipment must be matched to the selected hardware. The published reference configuration is summarised below.

  • Supply: 230 to 240 V, single phase, 50 or 60 Hz

04 / Useful heat

Keep cooling when heat demand falls.

These are applications to assess with a thermal designer, not promised outputs or evidence that recovery equipment is included.

Mining heat can be useful where there is a nearby demand at a suitable temperature. A separate heat exchanger can transfer useful heat to a compatible building or process circuit.

Keep independent heat rejection available when the receiving site cannot use the heat. Any recovery plant, temperature boost and additional pumps belong in the project specification and energy budget.

Miner heat in the loop→Isolated heat exchanger→Suitable local heat demand

Water preheating

Assess whether a separate water circuit can accept useful heat before its normal heating stage.

Greenhouse heating

Match the heating circuit to the crop schedule, seasonal demand and available water temperature.

Seasonal control

Retain independent cooling when the receiving building or process cannot accept heat. Account for pumps, fans and any temperature boost in the project economics.

05 / Before delivery

Specify the complete cooling loop.

A clear specification prevents the site and the equipment from being designed in isolation.

Plan the foundation, lifting route, service access, incoming power and external cooling together. Component weights and dimensions refer to the named parts and fill conditions, rather than automatically describing a complete operating installation.

Use the final general arrangement drawing for transport and installation clearances. The published duty is tied to its stated fluid and ambient temperatures.

Site and access

Agree the foundation, delivery route, lifting plan and service clearances for the supplied equipment.

Miner selection

Confirm physical fit, connection type and continuous electrical load before committing to a fleet quantity.

Commissioning

Define who installs, tests and commissions each part of the system, including external plant and monitoring.

Project questions

Clear from the start.

Are miners included?

Miners are separate unless expressly included in the written equipment schedule.

Is this available immediately?

Availability and lead time require confirmation. This page does not represent confirmed stock allocation.

What does the price cover?

The written quotation confirms the supplied equipment, miner quantity where included, freight, tax treatment and commissioning responsibilities. Availability and dispatch timing are confirmed for the order.

06 / Fleet planning

Also bought with.

Each fleet example is an alternative, not an additional group to combine. The final miner order needs an approved configuration.

Match the miner first

Choose the tank or liquid cooling loop by heat load, fluid and flow. A cooler has no miner positions and its headline duty does not establish a fleet quantity.

Request a matched fleet quotation

We will confirm miner revision, connections, cooling requirements and supported quantity before showing a combined price. Earnings totals need an identified miner and a current base estimate.

DCX Bitpod Immersion Tank — main product view

DCX Bitpod Immersion Tank

Candidate equipment for a matched cooling quotation. Confirm the complete loop and operating conditions.

Price on application

07 / Source and quotation

Plan your DCX project.

Manufacturer information is the starting point. The written quotation defines the supplied configuration.

Specifications are based on the manufacturer material linked below, using the configuration and conditions shown on this page.

Manufacturer images are reference illustrations or photographs. Equipment, accessories and layout must be confirmed in the final quotation.