MINING BUNDLE
15x Whatsminer M73 476TH
SHA-256 · 7.14 PH/s
15 miners · Hydro cooling · Without container
In stock
Catalogue preview — this bundle is not available to order yet.
- Hashrate
- 7.14 PH/s476 TH/s each
- Algorithm
- SHA-256
- Efficiency
- 14.5W/TH
- Power
- 103.53kW6.9kW each
- Total Power
- 103.53kW
- Earns/kWh
- 9.04p
Total Saving £8,420.00
Component Miner Rankings
These are the included individual miners’ existing ranks. Bundle economics use the complete configuration price, delivery, discount and auxiliary power. Mixed fleets show an average component percentage score, with the individual ranks in its breakdown.
Selected Equipment Schedule
15 miners · 103.53kW operating load. Only the following quantities and products are included in this configuration.
| Equipment | Quantity | Role |
|---|---|---|
| MicroBT Whatsminer M73 Hydro 476Th SHA-256 Bitcoin Miner | 15 | Miner |
Price Breakdown & Volume Discount
- Miner Subtotal
- £67,200.00
- Infrastructure Subtotal
- £0.00
- Miner Discount
- 12%
- Complete-package Delivery Allowance
- £3,000.00
The volume discount applies once to current published miner prices, including their embedded delivery allowance. Freight enters the complete package total once. Infrastructure is not discounted. Existing AER £10 rounding applies. Unconfirmed amounts are indicative, not an orderable offer.
Mining Earnings & Block Odds
Scenario, odds & assumptions
Constant-condition scenario, not a forecast. 100% operating time, £0.000/kWh, 2% pool service fee and 0% Solo service fee. Fees are editable assumptions; confirm your chosen provider’s charges. Network transaction rewards are included in the shared source estimate.
Operating power 103.53kW includes 0kW auxiliaries. Miner quantities are fixed. Auxiliary inputs must cover the listed cooling equipment.
Bitcoin equivalent is a display conversion of the selected mining routes, not a claim that the hardware mines Bitcoin. Recorded Bitcoin price £61,101.70 at 2026-10-20T09:33:10+00:00.
Auto selects the highest expected annual return after the entered fees and operating electricity for each algorithm. Equipment cost is fixed for the selected configuration. A higher expected Solo return does not mean a reliable payout.
- eCash Expected Blocks / Year
- 9,400.661443
- At Least One Block
- ≈100%
- No Blocks
- <0.0001%
- Block Value
- £8.72
Block probabilities use this fleet’s actual hashrate over the selected timeframe. Fractional expected blocks are a statistical average, not part of a block paid to you.
Excludes hosting, maintenance, taxes, finance and other operating charges not explicitly entered. Prices, difficulty, rewards and uptime can change. Network inputs: . Calculated .
| Asset / Mode | Expected Earnings |
|---|---|
| SHA-256 · eCash · Solo | £81,997.03 |
| SHA-256 · DigiByte · Solo | £80,465.92 |
| SHA-256 · Quai · Solo | £76,925.30 |
| SHA-256 · Bitcoin Cash · Solo | £74,311.26 |
| SHA-256 · Bitcoin · Solo | £71,505.18 |
| SHA-256 · Bitcoin Cash · Pool | £71,436.43 |
| SHA-256 · Quai · Pool | £71,374.01 |
| SHA-256 · eCash · Pool | £69,782.37 |
| SHA-256 · Bitcoin · Pool | £68,783.70 |
| SHA-256 · Bitcoin · Pool | £68,705.68 |
| SHA-256 · Fractal Bitcoin · Solo | £68,495.32 |
| SHA-256 · Fractal Bitcoin · Pool | £67,644.58 |
| SHA-256 · DigiByte · Pool | £52,024.69 |
Equipment Scope & Site Requirements
Only the quantities and equipment in this product’s schedule.
Site works, upstream electrical supply, networking, commissioning, maintenance and any equipment not itemised.
- Miners and exact supply batch — see the itemised schedule.
- Rack, tank or container and chassis compatibility — included only if expressly itemised; otherwise excluded.
- Pumps and coolant distribution — included only if expressly itemised; otherwise excluded.
- Dry cooler or heat exchanger — included only if expressly itemised; otherwise excluded.
- Immersion fluid or approved hydro coolant — included only if expressly itemised; otherwise excluded.
- Pipework, valves and connections — included only if expressly itemised; otherwise excluded.
- Electrical distribution, protection and cabling — included only if expressly itemised; otherwise excluded.
- Networking, commissioning and site work — included only if expressly itemised; otherwise excluded.
Availability
Ordering will be enabled after the bundle catalogue review is complete.