MINING BUNDLE
200x Antminer S19k Pro 120TH + BC40 Elite Container · S19k Air Models for Immersion
SHA-256 · 24 PH/s
200 miners · Immersion cooling · With container
Out of stock

Catalogue preview — this bundle is not available to order yet.
- Hashrate
- 24 PH/s120 TH/s each
- Algorithm
- SHA-256
- Efficiency
- 23W/TH
- Power
- 552kW2.76kW each
- Miner Load
- 552kWAuxiliary power pending
- Earns/kWh
- Pending
Total Saving £104,000.00
Component Miner Rankings
These are the included individual miners’ existing ranks. Bundle economics use the complete configuration price, delivery, discount and auxiliary power. Mixed fleets show an average component percentage score, with the individual ranks in its breakdown.
Selected Equipment Schedule
200 miners · Pending operating load. Only the following quantities and products are included in this configuration.
| Equipment | Quantity | Role |
|---|---|---|
| Bitmain Antminer S19k Pro 120Th SHA-256 Bitcoin Miner | 200 | Miner |
| Fog Hashing BC40 Elite Immersion Mining Container | 1 | Infrastructure |
Container Layout · S19k Air Models for Immersion. Air-model immersion conversion proposal. Confirm model dimensions, fluid compatibility, PSU, fan/firmware preparation, electrical connections and preparation costs. Stock power and hashrate are unchanged. Proposed quantity uses the S21 layout ceiling; the S19k layout needs separate dimensional confirmation.
Antminer S19k Pro · Air Model for Immersion — Use the original air-cooled miner prepared for immersion. Confirm compatible fluid, PSU and electrical connections, fan/firmware preparation and itemised preparation costs. Catalogue hashrate and power are retained without assumed overclocking or savings.
Container Planning & Headroom
Provisional maximum per container: 200 miners, in 10 equal groups. Quantities allow 5% above listed miner power and reserve 10% of reference cooling and electrical capacity, and of flow where published. This is a planning allowance, not installation approval.
- Miner Design Load
- 579.6kW
- Auxiliary Electrical Allowance
- 96kW
- Cooling Headroom
- 324.4kW
Auxiliary allowances are conservative design bounds, not average electricity consumption. Running costs remain unconfirmed until the complete load schedule is supplied.
Published 1MW condition: 35 C ambient, 42/50 C coolant. No overclocking. Exact delivered revision, immersion preparation, tank fit, flow, electrical supply and fill volume remain unconfirmed.
Reserve 96kW for non-mining electrical load. Conservatively charge the full allowance to heat until pump heat is itemised. Retain the provisional 200-S21-Pro/S19k and 120-M66S ceilings. Cap S21 XP at 160 positions per container using the lower exact-model limit in the selected supplier package listing; this does not verify fit. Do not increase M66S capacity from a different brochure revision.
Manufacturer Equipment Reference
Current brochure: ten B100 tanks, ten smart PDUs, roof-mounted dry cooler, single-loop circulation, monitoring and safety equipment, with a 6000L fluid reference. This describes the manufacturer system; the supplied revision and order inclusions require confirmation.
Outstanding Supplier Checks
- Confirm the supplied tank/PDU revision, exact miner dimensions and circulation. Published newer 180-M66S positions do not establish compatibility for the existing 120-M66S proposal. The priced supplier listing limits S21 XP to 160; do not inherit the generic 200-machine headline.
- Confirm fluid type, supplied fill volume and costs: current brochure says 6000L; older supplier references differ.
- Confirm air-model immersion preparation, PSU/fluid compatibility and costs for S19k Pro, S21 Pro and S21 XP.
- Obtain actual auxiliary consumption, pump heat and electrical distribution for the selected layout. The 96kW planning bound is not a measured running load; S19k Pro requires its specified input voltage, not the full advertised PDU range.
Price Breakdown & Volume Discount
- Miner Subtotal
- £120,000.00
- Infrastructure Subtotal
- £173,100.00
- Miner Discount
- 15%
- Recorded AER Delivery Allowances
- £40,500.00
The volume discount applies once to current published miner prices, including their embedded delivery allowance. Freight enters the complete package total once. Infrastructure is not discounted. Existing AER £10 rounding applies. Unconfirmed amounts are indicative, not an orderable offer.
Power Consumption & Installation Requirements
- Miner Load
- 552kW
- Auxiliaries
- Unconfirmed
- Known Load Only
- 552kW
- Energy per 24 Hours
- 13,248kWh
Miner-only consumption is shown while auxiliary power is unconfirmed. Pumps, fans, controls and other site loads must be added; this is not a complete operating total.
Mining Earnings & Block Odds
Scenario, odds & assumptions
Constant-condition scenario, not a forecast. 100% operating time, £0.000/kWh, 2% pool service fee and 0% Solo service fee. Fees are editable assumptions; confirm your chosen provider’s charges. Network transaction rewards are included in the shared source estimate.
Operating power Pending includes Pending auxiliaries. Miner quantities are fixed. Auxiliary inputs must cover the listed cooling equipment.
Bitcoin equivalent is a display conversion of the selected mining routes, not a claim that the hardware mines Bitcoin. Recorded Bitcoin price £57,461.45 at 2026-10-30T20:18:31+00:00.
Auto selects the highest expected annual return after the entered fees and operating electricity for each algorithm. Equipment cost is fixed for the selected configuration. A higher expected Solo return does not mean a reliable payout.
- Quai Expected Blocks / Year
- 7,049,510.279916
- At Least One Block
- ≈100%
- No Blocks
- <0.0001%
- Block Value
- £0.04
Block probabilities use this fleet’s actual hashrate over the selected timeframe. Fractional expected blocks are a statistical average, not part of a block paid to you.
Excludes hosting, maintenance, taxes, finance and other operating charges not explicitly entered. Prices, difficulty, rewards and uptime can change. Network inputs: . Calculated .
| Asset / Mode | Expected Earnings |
|---|---|
| SHA-256 · Quai · Solo | £260,201.10 |
| SHA-256 · eCash · Solo | £242,687.85 |
| SHA-256 · Quai · Pool | £236,495.74 |
| SHA-256 · Bitcoin Cash · Solo | £222,014.06 |
| SHA-256 · Bitcoin Cash · Pool | £221,757.88 |
| SHA-256 · eCash · Pool | £217,518.90 |
| SHA-256 · Bitcoin · Solo | £215,619.08 |
| SHA-256 · Bitcoin · Pool | £208,203.00 |
| SHA-256 · Bitcoin · Pool | £206,576.42 |
| SHA-256 · Bitcoin Cash 2 · Pool | £186,712.35 |
| SHA-256 · DigiByte · Pool | £158,518.19 |
| SHA-256 · Bitcoin Cash 2 · Solo | £148,319.18 |
| SHA-256 · DigiByte · Solo | £97,387.61 |
| SHA-256 · Fractal Bitcoin · Solo | £86,473.29 |
| SHA-256 · Fractal Bitcoin · Pool | £70,238.94 |
Equipment Scope & Site Requirements
The selected equipment schedule itemises the miners and BC40 container(s). The selected public supplier package lists the container, 1000kW dry cooler and 6000L coolant per container. This is the pricing basis, not a confirmed supply allocation. Manufacturer reference: ten B100 tanks, ten smart PDUs, circulation, monitoring and safety equipment. Confirm the tank/PDU revision, coolant type and total fill, model-specific fit and immersion preparation; the supplier technical table separately lists 7000L system volume.
Site works, upstream electrical supply, networking, commissioning, maintenance and any equipment not itemised.
- Miners and exact supply batch — see the itemised schedule.
- Rack, tank or container and chassis compatibility — included only if expressly itemised; otherwise excluded.
- Pumps and coolant distribution — included only if expressly itemised; otherwise excluded.
- Dry cooler or heat exchanger — included only if expressly itemised; otherwise excluded.
- Immersion fluid or approved hydro coolant — included only if expressly itemised; otherwise excluded.
- Pipework, valves and connections — included only if expressly itemised; otherwise excluded.
- Electrical distribution, protection and cabling — included only if expressly itemised; otherwise excluded.
- Networking, commissioning and site work — included only if expressly itemised; otherwise excluded.
Availability
This configuration is a draft and is not available to buy yet. The included equipment, pricing and stock must be complete before it is listed for sale.
Outstanding Configuration Checks
- State auxiliary power and reserve explicitly.
- Air-model immersion preparation and its included costs need confirmation.
- Complete-package delivery allowance is missing.
- Infrastructure capacities need verification.
- Auxiliary load must include the infrastructure auxiliaries.
- Itemise the complete auxiliary load, including pumps, fans, coolers and controls.
- The complete auxiliary schedule must match the reviewed per-module loads; external loads cannot bypass module capacity checks.
- Electrical supply capacity is missing.
- Record the installation electrical reserve explicitly.
- Exact equipment fit and installation design need confirmation.
- Record the reviewed electrical design and its evidence.
- Record the reviewed cooling design and its evidence.
- Record the reviewed ancillaries design and its evidence.
- No valid per-module placement was found for the fleet and cooling limits.
- Planning headroom is provisional; confirm the supplied revision, site conditions and complete auxiliary schedule before installation approval.
- An included component is unavailable in the required quantity.
- The component specification or price changed; review this package.