BiXBiT IC 1000 Immersion Mining Container

Immersion Mining Container

Subject to quotation

The IC 1000 is a nominal 1 MW immersion container with different layouts for standard and immersion miner chassis. Power distribution and remote monitoring are included in the described system.

Equipment price

Price on application
Reference capacity1000 kW
Miner positions160 to 200 reference positions by model
CoolingImmersion

01 / Technical reference

The BiXBiT technical reference.

Match the delivered revision, electrical supply and cooling design to your selected fleet.

Nominal cooling duty1000 kW
Reference layouts200 S21; 180 T21, M66S or M76S; 160 S21 Imm or S21 XP Imm
Smart PDUs10
Container12192 × 2438 × 2896 mm
Container mass11290 kg, fill state unspecified
Cooler mass11100 kg, fill state unspecified
MonitoringWeb, local display, SNMP, Modbus and REST
CamerasIncluded in described monitoring arrangement

Reference figures are subject to the conditions and revision stated by the manufacturer.

02 / A place in your project

Liquid cooling at a scale that fits.

Choose a rack, tank or complete container around the fleet you intend to run. The right module gives the installation a clear electrical, cooling and servicing plan.

Choosing the format

The miners sit in dielectric fluid, which carries their heat to the external cooling equipment. Tank fit and fluid compatibility must be checked for the selected chassis.

The published component weights refer to different parts of the installation. Freight and foundation planning should use a complete equipment schedule, including any fluid and miners that are present during transport or operation.

Defining the scope

Build the quotation around the miner model, site location, available power and cooling conditions. Agree the equipment schedule, delivery arrangements and commissioning responsibilities before placing an order.

Cooling explained

Show how the cooling works

See how this cooling method moves heat away from the mining hardware.

Hardware in insulating fluid

Compatible hardware sits in a dielectric fluid that absorbs its heat. The fluid passes through a cooler directly, or transfers heat to a separate circuit through an exchanger.

Why choose immersion

Immersion can reduce miner fan noise and exposure to airborne dust. It also brings the heat into a liquid circuit that can support a planned heat reuse system.

What the site needs

Use fluid approved for the hardware, seals and circuit materials. Allow for filling, fluid handling and servicing, along with the electrical load and space required by pumps and external coolers.

Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.

Power distribution and controls

Power distribution and cooling equipment must be matched to the selected hardware. The published reference configuration is summarised below.

  • Smart PDUs: 10
  • Monitoring: Web, local display, SNMP, Modbus and REST

04 / Useful heat

Give the heat a purpose.

These are applications to assess with a thermal designer, not promised outputs or evidence that recovery equipment is included.

Mining heat can be useful where there is a nearby demand at a suitable temperature. A separate heat exchanger can transfer useful heat to a compatible building or process circuit.

Keep independent heat rejection available when the receiving site cannot use the heat. Any recovery plant, temperature boost and additional pumps belong in the project specification and energy budget.

Mining heat→Isolated heat exchanger→Suitable local heat demand

Water preheating

Assess whether a separate water circuit can accept useful heat before its normal heating stage.

Greenhouse heating

Match the heating circuit to the crop schedule, seasonal demand and available water temperature.

Seasonal control

Retain independent cooling when the receiving building or process cannot accept heat. Account for pumps, fans and any temperature boost in the project economics.

05 / Before delivery

Define the delivered configuration.

A clear specification prevents the site and the equipment from being designed in isolation.

Plan the foundation, lifting route, service access, incoming power and external cooling together. Component weights and dimensions refer to the named parts and fill conditions, rather than automatically describing a complete operating installation.

Site and access

Agree the foundation, delivery route, lifting plan and service clearances for the supplied equipment.

Miner selection

Confirm physical fit, connection type and continuous electrical load before committing to a fleet quantity.

Commissioning

Define who installs, tests and commissions each part of the system, including external plant and monitoring.

Project questions

Clear from the start.

Are miners included?

Miners are separate unless expressly included in the written equipment schedule.

Is this available immediately?

Availability and lead time require confirmation. This page does not represent confirmed stock allocation.

What does the price cover?

The written quotation confirms the supplied equipment, miner quantity where included, freight, tax treatment and commissioning responsibilities. Availability and dispatch timing are confirmed for the order.

06 / Fleet planning

Also bought with.

Each fleet example is an alternative, not an additional group to combine. The final miner order needs an approved configuration.

BiXBiT lists 160 S21 Imm or S21 XP Imm positions for IC 1000. This example uses the native S21 Immersion model. Confirm the supplied layout, miner revision, circuit protection and coolant connections. The quoted configuration must approve the quantity. These are planning combinations, not a record of previous purchases.

160 miners · planning quantity

Confirm fleet availability

Bitmain Antminer S21 Immersion 220Th SHA-256 Bitcoin Miner
Bitmain
Hashrate
220TH
Efficiency
16W/TH
Power
3520W
Earns/kWh
8.2p
Price · delivered
£1,698.00
ex VAT
Est. per month
£210.92
System + miner hardwareInfrastructure quoted separately160 × £1,698.00 per miner · infrastructure price on application
How the fleet totals work

Quantity is the lower of 160 manufacturer reference positions and the whole number within the 1000 kW reference cooling allowance, with 5% added to catalogue miner wattage. This checks the overall system only. It does not establish the capacity of an individual tank, rack, PDU or circuit. Those limits and auxiliary loads require a separate approved schedule.

Miner cost and gross monthly earnings use current catalogue unit values multiplied by quantity. Earnings use the same base field as the homepage cards, before electricity, operating costs and downtime. No heat income or bulk discount is assumed. The infrastructure is quoted separately. These totals are illustrations, not guarantees of income or availability.

07 / Source and quotation

Plan a BiXBiT installation.

Manufacturer information is the starting point. The written quotation defines the supplied configuration.

Specifications are based on the manufacturer material linked below, using the configuration and conditions shown on this page.

Manufacturer images are reference illustrations or photographs. Equipment, accessories and layout must be confirmed in the final quotation.