Skip to main content
£0.00 0

Basket

No products in the basket.

Bitmain ANTSPACE HW5 1.2MW Hydro Mining Container — main product view
Bitmain ANTSPACE HW5 1.2MW Hydro Mining Container — Main product view

BITMAIN · Mining containers

ANTSPACE HW5

Hydro mining container

November preorder

Price on request. This mining container is available by enquiry. Contact us for a quotation covering the required configuration, delivery and installation arrangements. Request a quote.

The Bitmain ANTSPACE HW5 brings up to 210 compatible hydro miner positions, a circulation system and a dry wet cooling module into a 40ft container. Cooling capacity is rated at 1,200kW. Available on preorder from The Mining Shop, with the miner configuration and site water requirements confirmed before ordering.

Container price

Price on request

Delivery, tax treatment and equipment inclusions confirmed with your quotation.

Cooling capacity1200 kW
Miner positionsUp to 210
CoolingHydro

01 / Technical details

Specifications at a glance.

Check the figures for ANTSPACE HW5 against your miner fleet and available site services.

Manufacturer BITMAIN
Model ANTSPACE HW5
Cooling Hydro with integrated dry wet cooling module
Cooling capacity 1,200kW / 1.2MW heat dissipation
Miner positions Up to 210 compatible hydro miners
Current listed families ANTMINER S19 Hyd., S21 Hyd. and S23 Hyd.; verify supplied revision
Container dimensions 12,192 × 2,438 × 2,896mm (L × W × H)
Input supply 400V ±5%, 50/60Hz
Published cooling water consumption 0.7 to 1.3m³/h; configuration and conditions dependent
Distribution main switches 2 × 1200A
Published rated current Up to 986A × 2
Current per miner position Up to 10A
Current catalogue normal power 1200kW
Coolant circulation flow At least 85m³/h
Cooling module power 15 to 29kW
Cooler supply temperature 35°C at 28°C wet bulb
Cooling water consumption 0.7 to 1.3m³/h
System coolant volume 1.6m³
Water supply / drain connections DN40 / DN65
Container shipping / operating weight 14t / 24t
Reference PUE 1.017 at 25°C ambient
Noise reference 70dBA at 15m and 25°C

Manufacturer reference values. Final configuration and equipment schedule confirmed before ordering.

02 / The container

Inside the ANTSPACE HW5.

Capacity, compatibility and the details that matter when planning your installation.

Hydro mining with integrated cooling

The Bitmain ANTSPACE HW5 hydro mining container combines accommodation for up to 210 compatible miners with a hydro circulation system and a dry wet cooling module. The integrated 40ft arrangement offers a practical starting point for operators planning a commercial Bitcoin mining site.

Match the HW5 to your machines

The cooling module is rated for 1,200kW of heat dissipation. BITMAIN’s current catalogue lists the S19 Hyd., S21 Hyd. and S23 Hyd. families. Compatibility must be checked against the revision being supplied and each miner’s requirements, with the final fleet size kept within the electrical and cooling limits.

Water availability matters

The published cooling water consumption is 0.7 to 1.3 cubic metres per hour for the specified configuration. A suitable water supply and drainage therefore belong in the site plan alongside electrical capacity, foundations and access for delivery. Confirm these requirements before committing to a location.

Plan a November preorder

The ANTSPACE HW5 is available through The Mining Shop on a November preorder allocation. Send us your proposed miner list, available power and water supply details to discuss suitability and confirm the batch, dispatch schedule and package contents.

03 / Power and cooling

Inside the infrastructure.

Distribution cabinets, PDU functions and the supporting equipment for ANTSPACE HW5.

Cabinets and miner feeds

Two 1200A main switches supply the HW5 distribution system. The current catalogue gives a rated current of up to 986A on each feed and up to 10A per miner. Socket type and miner leads must be matched to the exact ANTMINER PSU.

Integrated cooling equipment

The HW5 combines the miner enclosure and dry wet cooling equipment in a 40ft package. Its circulation system includes pumps, manifolds, filters and controls. The published water use is make up water for cooling; it is not the closed circuit flow through the miners.

Installation and maintenance

Allow for water quality management, drainage, access to filters and fan servicing. The support sheet specifies at least 2m of air intake clearance and a prepared supporting surface. Transformers and external electrical infrastructure need a separate project specification.

Specification revisions and equipment confirmation

The 2024 support sheet lists 1062kW operating power and PUE 1.032. The current shop sheet lists 1200kW and PUE 1.017 at 25°C. The example fleet calculations use the lower 1062kW ceiling until the supplied revision is confirmed. Request the single line diagram, breaker schedule, PDU outlet model, cable list, cooling schematic and commissioning requirements for the unit supplied.

04 / Heat reuse

Put mining heat to work.

Potential applications for an engineered recovery system. Heating equipment is not included in the container price unless expressly quoted.

ANTSPACE HW5: what is supported?

The HW5 carries miner heat in a liquid circuit, so reuse may be feasible through a separately designed heat exchanger and secondary loop. The current HW5 specification does not confirm an included heat recovery kit. Cooling water outlet figures must not be presented as a guaranteed heating delivery temperature.

Miner cooling circuit→Separate heat exchanger→Heating loop or heat pump→Useful heat demand

Building and district heating

Nearby buildings or a heat network may accept recovered heat directly at suitable temperatures, or through a heat pump. MARA reports operating district heating projects in Finland; these demonstrate the application, not certification of this ANTSPACE model.

Read the district heating example ↗

Greenhouses and growing spaces

A greenhouse with a suitable heating circuit is a potential heat user. GDA has researched the use of mining heat for greenhouse farming in Sweden. A project needs a seasonal heat demand calculation rather than a fixed area per container claim.

Read the greenhouse project ↗

Pool and process water preheating

As a project concept, recovered heat could preheat pool or process water through an isolated secondary circuit. The usable temperature, exchanger materials, water treatment and backup heating must be designed for that application.

What a heat recovery design needs to establish

Confirm miner supply and return temperature limits, flow, pressure loss, fluid compatibility, heat exchanger duty, the receiving system temperature and year round demand. Add bypass controls and retain sufficient cooling for summer or loss of heat demand. A heat pump may be needed for a higher delivery temperature. The cooling rating is not guaranteed recoverable heat, and no heat sales or heating savings are included in the earnings below.

BITMAIN offers waste heat heating design services. Obtain approval for the exact container revision before modifying its circuit.

05 / Plan your installation

Get your site ready.

Share your miner list and site details with our team before confirming the container configuration.

Power supply

Confirm voltage, distribution and total site demand. Include the miners, cooling equipment and other electrical loads.

Cooling requirements

Check ambient conditions, the cooling circuit and any water or immersion fluid requirements for your chosen equipment.

Delivery and access

Plan vehicle access, unloading, foundations and service clearances. Agree the delivery scope before arranging installation.

Does integrated cooling remove the need for site preparation?

The container still needs a suitable supply, foundation, access and the required water services. An integrated package can reduce separate equipment, but the external connections and commissioning scope must be agreed.

Can the full rack count be used for every S21 Hydro model?

The final quantity depends on the exact miner power and current, not only the available positions. Check the supplied PDU schedule and cooling duty before buying a full fleet.

Before you order

Your questions.

Are miners included?

Confirm the supplied equipment list in your quotation. Do not assume ASIC miners, accessories or installation are included in the container price.

Will my miners fit this container?

Compatibility depends on the exact miner model, cooling method, electrical connections and configuration. Send us your proposed miner list for checking.

How are preorder dates confirmed?

Ask for the current allocation and expected dispatch window. The quoted lead time and delivery arrangements will be confirmed for your order.

06 / Compatible fleet examples

Also bought with.

Compare suitable ANTMINER families using current catalogue base values. Each card represents an alternative fleet of one model, not three fleets to combine.

These examples use the S19 Pro Hydro j0 10 family, whose manufacturer sheet specifies 10A per phase. Newer S21 Hydro variants with a 12A maximum input are excluded from these 10A position examples. Confirm the exact PSU, connectors, rack fit and coolant flow before placing a fleet order. These catalogue models are currently out of stock; the totals are planning comparisons, not an offer of immediate fleet availability. Manufacturer electrical specification

186 miners · planning quantity

Currently out of stock

Bitmain Antminer S19 Pro Hydro 184Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
184TH
Efficiency
29.5W/TH
Power
5428W
Earns/kWh
4.9p
Price · delivered
£1,700.00
ex VAT
Est. per month
£192.73
Miner hardware subtotal£316,200.00186 × £1,700.00 per miner · container quoted separately
193 miners · planning quantity

Currently out of stock

Bitmain Antminer S19 Pro Hydro 177Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
177TH
Efficiency
29.5W/TH
Power
5221.5W
Earns/kWh
4.9p
Price · delivered
£1,578.00
ex VAT
Est. per month
£185.40
Miner hardware subtotal£304,554.00193 × £1,578.00 per miner · container quoted separately
201 miners · planning quantity

Currently out of stock

Bitmain Antminer S19 Pro Hydro 170Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
170TH
Efficiency
29.5W/TH
Power
5015W
Earns/kWh
4.9p
Price · delivered
£1,800.00
ex VAT
Est. per month
£178.06
Miner hardware subtotal£361,800.00201 × £1,800.00 per miner · container quoted separately
How quantities, prices and earnings are calculated

Planning quantity = the lower of the supported slot count and the whole number of miners within the chosen power budget, allowing 5% above each miner's catalogue wattage. This page uses 1062kW for ANTSPACE HW5. HD5 reserves 100kW from its 1512kW normal figure; HW5 uses the older 1062kW limit until its revision is confirmed; HW7 reserves 100kW below its 2000kW cooling rating; MD5 reserves 100kW within its 1000kW container figure. These are conservative screening assumptions, not commissioned or manufacturer approved fleet sizes.

Fleet price = current unit price × quantity. Fleet gross monthly earnings = the same per miner base earnings field used by the homepage card × quantity. Hashrate and miner power also scale with quantity; efficiency and earnings per kWh remain per unit ratios. A combined hardware total is shown only where a container price is available; otherwise the container is quoted separately. No bulk discount, electrical infrastructure, delivery adjustment, cooling electricity, downtime or heat income is assumed.

Gross earnings are estimates before electricity and operating costs. Final quantities also depend on ambient temperature, coolant flow, distribution across cabinets, PSU connectors and the approved rack layout. Check stock allocation and the complete quote before ordering. This section shows compatibility examples and does not claim a purchase history.

Technical references

Check the supplied configuration.

BITMAIN ANTSPACE HW5 specification and image gallery ↗

Supporting ANTSPACE HW5 documentation ↗

Research checked 24 September 2026. Images show manufacturer reference configurations. Request the serial number specific equipment schedule and drawings with your quotation.