Bitmain ANTSPACE HW5 1.2MW Hydro Mining Container product view 1
Bitmain ANTSPACE HW5 1.2MW Hydro Mining Container product view 1

BITMAIN · Mining containers

ANTSPACE HW5

Hydro mining container

November preorder

Price on request. This mining container is available by enquiry. Contact us for a quotation covering the required configuration, delivery and installation arrangements. Request a quote.

The ANTSPACE HW5 combines space for 210 compatible hydro miners with a closed cooling circuit and a dry and wet cooling tower. Its published cooling duty is 1200 kW.

Container price

£43,600.00

Delivery, tax treatment and equipment inclusions confirmed with your quotation.

Cooling capacity1200 kW
Miner positions210 reference positions
CoolingHydro

01 / Technical details

Specifications at a glance.

Check the figures for ANTSPACE HW5 against your miner fleet and available site services.

RevisionV1, support sheet updated 1 August 2024
Dimensions12192 × 2438 × 2896 mm
Positions210 S19 Hyd. or S21 Hyd. reference machines
Operating input1062 kW in V1
Cooling duty1200 kW
Supply400 V ±5%, 50 or 60 Hz
Main switches2 × 1200 A
Position currentUp to 10 A
Circuit flowAt least 85 m³/h
Tower input15 to 29 kW
Water consumption0.7 to 1.3 m³/h
Supply liquid35°C at 28°C wet bulb
Shipping mass14000 kg
Operating mass24000 kg
PUE1.032 in V1
Noise70 dBA at 15 m and 25°C
Water connectionsDN40 supply and DN65 drain
Manufacturer announcement19 June 2024
Headroom reference (11 October 2026)Manual v1.13: 1200kW cooling at the specified wet-bulb duty point; 1062kW rated power reference.
Coolant flow referencePublished at least 85m3/h. A pump curve and per-miner distribution still need confirmation.
Auxiliary power referenceDry-wet tower 15-29kW. Complete pump, control and other auxiliary schedule not yet confirmed.

Manufacturer reference values. Final configuration and equipment schedule confirmed before ordering.

02 / The equipment

Built around the site.

Choose the configuration around the miner fleet and available site services.

Inside the installation

The ANTSPACE HW5 combines space for 210 compatible hydro miners with a closed cooling circuit and a dry and wet cooling tower. Its published cooling duty is 1200 kW.

The selected miner chassis, operating load and site conditions define the final equipment schedule. We can quote the infrastructure together with a compatible fleet and the supporting equipment required for the installation.

Defining the scope

The quotation identifies the supplied equipment, compatible miners and required connections. Final capacity depends on the selected hardware and site conditions.

Cooling explained

Show how the cooling works

See how this cooling method moves heat away from the mining hardware.

Liquid through the miner

Coolant flows through passages inside a compatible hydro miner. It carries heat into pipework and onward to the cooling equipment. The electronics are not submerged.

Why choose hydro

Liquid circuits suit dense installations and reduce reliance on fast fans inside each miner. They also provide a defined route for collecting useful heat.

What the site needs

Match the coolant, flow and pressure to the miner. Include pumps, leak monitoring and suitable outdoor cooling. Pumps and external fans still consume power and create noise.

Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.

Power distribution and controls

Power distribution and cooling equipment must be matched to the selected hardware. The published reference configuration is summarised below.

  • Supply: 400 V ±5%, 50 or 60 Hz
  • Main switches: 2 × 1200 A
  • Circuit flow: At least 85 m³/h
  • Supply liquid: 35°C at 28°C wet bulb

04 / Useful heat

Give the heat a purpose.

Match heat recovery to a real local demand.

Mining heat can be useful where there is a nearby demand at a suitable temperature. A separate heat exchanger can transfer useful heat to a compatible building or process circuit.

Keep independent heat rejection available when the receiving site cannot use the heat. Any recovery plant, temperature boost and additional pumps belong in the project specification and energy budget.

Mining heat→Controlled transfer→Suitable local heat demand

05 / Plan your installation

Get your site ready.

Share your miner list and site details with our team before confirming the container configuration.

Power supply

Confirm voltage, distribution and total site demand. Include the miners, cooling equipment and other electrical loads.

Cooling requirements

Check ambient conditions, the cooling circuit and any water or immersion fluid requirements for your chosen equipment.

Delivery and access

Plan vehicle access, unloading, foundations and service clearances. Agree the delivery scope before arranging installation.

Does integrated cooling remove the need for site preparation?

The container still needs a suitable supply, foundation, access and the required water services. An integrated package can reduce separate equipment, but the external connections and commissioning scope must be agreed.

Can the full rack count be used for every S21 Hydro model?

The final quantity depends on the exact miner power and current, not only the available positions. Check the supplied PDU schedule and cooling duty before buying a full fleet.

Before you order

Your questions.

Are miners included?

Confirm the supplied equipment list in your quotation. Do not assume ASIC miners, accessories or installation are included in the container price.

Will my miners fit this container?

Compatibility depends on the exact miner model, cooling method, electrical connections and configuration. Send us your proposed miner list for checking.

How are preorder dates confirmed?

Ask for the current allocation and expected dispatch window. The quoted lead time and delivery arrangements will be confirmed for your order.

06 / Compatible fleet examples

Also bought with.

Compare suitable ANTMINER families using current catalogue base values. Each card represents an alternative fleet of one model, not three fleets to combine.

These examples use the S19 Pro Hydro j0 10 family, whose manufacturer sheet specifies 10A per phase. Newer S21 Hydro variants with a 12A maximum input are excluded from these 10A position examples. Confirm the exact PSU, connectors, rack fit and coolant flow before placing a fleet order. These catalogue models are currently out of stock; the totals are planning comparisons, not an offer of immediate fleet availability. Manufacturer electrical specification

186 miners · planning quantity
Card specs, price and earnings per miner

Currently out of stock

Bitmain Antminer S19 Pro Hydro 184Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
184TH
Efficiency
29.5W/TH
Power
5428W
Earns/kWh
3.2p
Price · delivered
£2,100.00
ex VAT
Est. per month
£128.22
Fleet total · container + miner hardware£434,200.00186 × £2,100.00 per miner · container £43,600.00
193 miners · planning quantity
Card specs, price and earnings per miner

Currently out of stock

Bitmain Antminer S19 Pro Hydro 177Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
177TH
Efficiency
29.5W/TH
Power
5222W
Earns/kWh
3.2p
Price · delivered
£1,978.00
ex VAT
Est. per month
£123.35
Fleet total · container + miner hardware£425,354.00193 × £1,978.00 per miner · container £43,600.00
201 miners · planning quantity
Card specs, price and earnings per miner

Currently out of stock

Bitmain Antminer S19 Pro Hydro 170Th SHA-256 Bitcoin Miner
Bitmain
Out of stock
Hashrate
170TH
Efficiency
29.5W/TH
Power
5015W
Earns/kWh
3.2p
Price · delivered
£2,200.00
ex VAT
Est. per month
£118.47
Fleet total · container + miner hardware£485,800.00201 × £2,200.00 per miner · container £43,600.00
How quantities, prices and earnings are calculated

Planning quantity = the lower of the supported slot count and the whole number of miners within the chosen power budget, allowing 5% above each miner's catalogue wattage. This page uses 1062kW for ANTSPACE HW5. HD5 reserves 100kW from its 1512kW normal figure; HW5 uses the older 1062kW limit until its revision is confirmed; HW7 reserves 100kW below its 2000kW cooling rating; MD5 reserves 100kW within its 1000kW container figure. These are conservative screening assumptions, not commissioned or manufacturer approved fleet sizes.

Fleet price = current unit price × quantity. Fleet gross monthly earnings = the same per miner base earnings field used by the homepage card × quantity. Hashrate and miner power also scale with quantity; efficiency and earnings per kWh remain per unit ratios. A combined hardware total is shown only where a container price is available; otherwise the container is quoted separately. No bulk discount, electrical infrastructure, delivery adjustment, cooling electricity, downtime or heat income is assumed.

Gross earnings are estimates before electricity and operating costs. Final quantities also depend on ambient temperature, coolant flow, distribution across cabinets, PSU connectors and the approved rack layout. Check stock allocation and the complete quote before ordering. This section shows compatibility examples and does not claim a purchase history.

07 / Source and quotation

Plan your project.

The equipment schedule defines the configuration supplied.

Specifications are based on the manufacturer material linked below, using the configuration and conditions shown on this page.