Compare mining revenue per kWh with the value of exporting your electricity. Choose a package that fits your available power and operating window.
Preorder · estimated six-week dispatch
Size a mining load around your renewable generation. Choose a 24kW, 72kW, 100kW, 300kW, 500kW or 1MW site power budget and compare estimated mining earnings per kWh with the income available from exporting electricity. The equipment schedule shows the actual number of miners, their operating load and a separate allowance for auxiliaries.
This is a bulk hardware package. The budget includes a preliminary allowance for site auxiliaries, but cooling infrastructure, buildings, switchgear and installation are not included. The currently linked Z15K supplier batch is January 2027. It does not meet a six week dispatch window from October 2026. This package remains quotation only until a suitable allocation is confirmed.
Volume pricing applies to the miner subtotal: 5% for 5 or more miners, 8% for 10 or more, 12% for 15 or more and 15% for 20 or more. Infrastructure and complete package freight are priced separately. These are planning configurations, with estimated dispatch six weeks after payment and final configuration approval once supply has been confirmed.
Lead time starts after payment and final configuration approval. Transit time is additional. Equipment availability and site requirements are confirmed in the written quotation.
Choose your site-power budget
Capacity includes miners and the stated auxiliary load. Unverified configurations are estimates for planning and cannot be ordered online.
Earns per kWh37.43p
Miners8
Estimated operating load21.06kW
Power budget24kW
Equihash: 4,200.00 KSol/s
Miner load 19.86kW · auxiliary allowance 1.20kW · unallocated capacity 2.94kW. Auxiliary figures remain a design estimate until confirmed.
Indicative standard total£47,300.00£44,960.00Save £2,340.00 · 5% miner volume tierGBP excluding VAT, including the stated complete-package delivery allowance. Budget estimate, subject to equipment and freight confirmation.
Illustrative inputs: 8 hours per day and 5p/kWh. Estimates scale current earnings across 30 days. They do not forecast network difficulty, prices or generation, and exclude other operating costs and the preorder waiting period.
Preorder specification under review. We will confirm exact fit, cooling, supply allocation and freight before accepting an order.
Earns per kWh37.59p
Miners26
Estimated operating load68.16kW
Power budget72kW
Equihash: 13,650.00 KSol/s
Miner load 64.56kW · auxiliary allowance 3.60kW · unallocated capacity 3.84kW. Auxiliary figures remain a design estimate until confirmed.
Indicative standard total£152,600.00£129,790.00Save £22,810.00 · 15% miner volume tierGBP excluding VAT, including the stated complete-package delivery allowance. Budget estimate, subject to equipment and freight confirmation.
Illustrative inputs: 8 hours per day and 5p/kWh. Estimates scale current earnings across 30 days. They do not forecast network difficulty, prices or generation, and exclude other operating costs and the preorder waiting period.
Preorder specification under review. We will confirm exact fit, cooling, supply allocation and freight before accepting an order.
Earns per kWh37.58p
Miners36
Estimated operating load94.39kW
Power budget100kW
Equihash: 18,900.00 KSol/s
Miner load 89.39kW · auxiliary allowance 5.00kW · unallocated capacity 5.61kW. Auxiliary figures remain a design estimate until confirmed.
Indicative standard total£211,100.00£179,510.00Save £31,590.00 · 15% miner volume tierGBP excluding VAT, including the stated complete-package delivery allowance. Budget estimate, subject to equipment and freight confirmation.
Illustrative inputs: 8 hours per day and 5p/kWh. Estimates scale current earnings across 30 days. They do not forecast network difficulty, prices or generation, and exclude other operating costs and the preorder waiting period.
Preorder specification under review. We will confirm exact fit, cooling, supply allocation and freight before accepting an order.
Earns per kWh37.58p
Miners108
Estimated operating load283.16kW
Power budget300kW
Equihash: 56,700.00 KSol/s
Miner load 268.16kW · auxiliary allowance 15.00kW · unallocated capacity 16.84kW. Auxiliary figures remain a design estimate until confirmed.
Indicative standard total£632,300.00£537,530.00Save £94,770.00 · 15% miner volume tierGBP excluding VAT, including the stated complete-package delivery allowance. Budget estimate, subject to equipment and freight confirmation.
Illustrative inputs: 8 hours per day and 5p/kWh. Estimates scale current earnings across 30 days. They do not forecast network difficulty, prices or generation, and exclude other operating costs and the preorder waiting period.
Preorder specification under review. We will confirm exact fit, cooling, supply allocation and freight before accepting an order.
Earns per kWh37.60p
Miners181
Estimated operating load474.42kW
Power budget500kW
Equihash: 95,025.00 KSol/s
Miner load 449.42kW · auxiliary allowance 25.00kW · unallocated capacity 25.58kW. Auxiliary figures remain a design estimate until confirmed.
Indicative standard total£1,059,350.00£900,520.00Save £158,830.00 · 15% miner volume tierGBP excluding VAT, including the stated complete-package delivery allowance. Budget estimate, subject to equipment and freight confirmation.
Illustrative inputs: 8 hours per day and 5p/kWh. Estimates scale current earnings across 30 days. They do not forecast network difficulty, prices or generation, and exclude other operating costs and the preorder waiting period.
Preorder specification under review. We will confirm exact fit, cooling, supply allocation and freight before accepting an order.
Earns per kWh37.60p
Miners362
Estimated operating load948.85kW
Power budget1,000kW
Equihash: 190,050.00 KSol/s
Miner load 898.85kW · auxiliary allowance 50.00kW · unallocated capacity 51.15kW. Auxiliary figures remain a design estimate until confirmed.
Indicative standard total£2,118,200.00£1,800,550.00Save £317,650.00 · 15% miner volume tierGBP excluding VAT, including the stated complete-package delivery allowance. Budget estimate, subject to equipment and freight confirmation.
Illustrative inputs: 8 hours per day and 5p/kWh. Estimates scale current earnings across 30 days. They do not forecast network difficulty, prices or generation, and exclude other operating costs and the preorder waiting period.
Preorder specification under review. We will confirm exact fit, cooling, supply allocation and freight before accepting an order.
What is included
Only the miners and infrastructure listed in the selected equipment schedule. Quantities change with the selected site power budget. Product images illustrate the component, not a completed site.
Site preparation and exclusions
Site survey, planning permissions, grid connection, transformer, distribution boards, cabling, civil works, networking, curtailment controls, commissioning, pool fees and ongoing maintenance unless expressly included in your quotation. Immersion fluid, pipework, pumps, dry coolers and heat recovery equipment must be itemised before an installation is ordered.
Cooling explained
Show how the cooling works
See how this cooling method moves heat away from the mining hardware.
01Hydro minerLiquid inside cooling passages
Warm circuit →← Cooled return
02Heat exchangerSeparates the two circuits
Warm circuit →← Cooled return
03Outdoor coolerReleases heat into the air
✣✣
Liquid through the miner
Coolant flows through passages inside a compatible hydro miner. It carries heat into pipework and onward to the cooling equipment. The electronics are not submerged.
Why choose hydro
Liquid circuits suit dense installations and reduce reliance on fast fans inside each miner. They also provide a defined route for collecting useful heat.
What the site needs
Match the coolant, flow and pressure to the miner. Include pumps, leak monitoring and suitable outdoor cooling. Pumps and external fans still consume power and create noise.
01Immersion tankHardware in dielectric fluid
Warm circuit →← Cooled return
02Heat exchangerSeparates the two circuits
Warm circuit →← Cooled return
03Outdoor coolerReleases heat into the air
✣✣
Hardware in insulating fluid
Compatible hardware sits in a dielectric fluid that absorbs its heat. The fluid passes through a cooler directly, or transfers heat to a separate circuit through an exchanger.
Why choose immersion
Immersion can reduce miner fan noise and exposure to airborne dust. It also brings the heat into a liquid circuit that can support a planned heat reuse system.
What the site needs
Use fluid approved for the hardware, seals and circuit materials. Allow for filling, fluid handling and servicing, along with the electrical load and space required by pumps and external coolers.
01Filtered inletCooler air enters
✣✣
Heat to air →
02Miner fleetAir absorbs hardware heat
Heat to air →
03Fans and exhaustWarm air leaves
✣✣
Air through the machines
Fans move air through the miners, collecting heat before discharging it outside. A clear path between the filtered inlet and exhaust helps prevent hot air returning to the machines.
Why choose air
The hardware remains directly accessible, and standard air cooled miners can be serviced without draining a liquid circuit. Filters can be selected for the site environment.
What the site needs
Size ventilation for the fleet and local temperature. Consider dust, filter resistance and sound at the site boundary. The sum of fan catalogue ratings is not a measurement of installed airflow.
Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.
Mining with renewable generation
How should I use earnings per kWh?
It is estimated gross mining revenue divided by the electricity consumed by the miners and stated auxiliaries. Compare it with your electricity cost or the export income you would give up. It excludes maintenance, pool fees, taxes and other operating costs.
Can the package run only when surplus power is available?
The calculator models your selected operating hours. Actual output depends on the generation profile, startup time, control equipment and manufacturer operating limits. Automated curtailment and dispatch controls must be specified for your site.
Can I use the heat?
Electrical consumption becomes heat, but useful heat recovery depends on temperature, demand, pipework and heat exchangers. No heat revenue or heating saving is included in these figures.
How are package discounts calculated?
5–9 miners: 5%; 10–14: 8%; 15–19: 12%; 20 or more: 15%. The highest tier applies once to the miner subtotal. Infrastructure and delivery are excluded. Final package totals are rounded to £10; savings are the difference between the displayed totals. Additional cart volume discounts and coupons do not stack.
We use necessary cookies to run the shop and optional analytics cookies to understand how visitors use the site and improve shopping and checkout. You can accept analytics, use only necessary cookies, or choose settings. You can change your choice at any time.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.