Skip to main content
£0.00 0

Basket

No products in the basket.

PUT SURPLUS GENERATION TO WORK

Bitmain Antminer L7 9050Mh Litecoin and Dogecoin Mining Packages

Compare mining revenue per kWh with the value of exporting your electricity. Choose a package that fits your available power and operating window.

Preorder · estimated six-week dispatch
Bitmain Antminer L7 9050Mh Scrypt Litecoin & Dogecoin Miner — main product view

Size a mining load around your renewable generation. Choose a 24kW, 72kW, 100kW, 300kW, 500kW or 1MW site power budget and compare estimated mining earnings per kWh with the income available from exporting electricity. The equipment schedule shows the actual number of miners, their operating load and a separate allowance for auxiliaries.

This is a bulk hardware package. The budget includes a preliminary allowance for site auxiliaries, but cooling infrastructure, buildings, switchgear and installation are not included.

Volume pricing applies to the miner subtotal: 5% for 5 or more miners, 8% for 10 or more, 12% for 15 or more and 15% for 20 or more. Infrastructure and complete package freight are priced separately. These are planning configurations, with estimated dispatch six weeks after payment and final configuration approval once supply has been confirmed.

Lead time starts after payment and final configuration approval. Transit time is additional. Equipment availability and site requirements are confirmed in the written quotation.

Choose your site-power budget

Capacity includes miners and the stated auxiliary load. Unverified configurations are estimates for planning and cannot be ordered online.

Earns per kWh4.80p
Miners6
Estimated operating load20.75kW
Power budget24kW

Scrypt: 54.30 GH/s

Miner load 19.55kW · auxiliary allowance 1.20kW · unallocated capacity 3.25kW. Auxiliary figures remain a design estimate until confirmed.

Indicative standard total£6,440.00£6,140.00Save £300.00 · 5% miner volume tierGBP excluding VAT, including the stated complete-package delivery allowance. Budget estimate, subject to equipment and freight confirmation.

Equipment schedule

Compare mining with exporting your energy

Illustrative inputs: 8 hours per day and 5p/kWh. Estimates scale current earnings across 30 days. They do not forecast network difficulty, prices or generation, and exclude other operating costs and the preorder waiting period.

Request this package quotation

Preorder specification under review. We will confirm exact fit, cooling, supply allocation and freight before accepting an order.

What is included

Only the miners and infrastructure listed in the selected equipment schedule. Quantities change with the selected site power budget. Product images illustrate the component, not a completed site.

Site preparation and exclusions

Site survey, planning permissions, grid connection, transformer, distribution boards, cabling, civil works, networking, curtailment controls, commissioning, pool fees and ongoing maintenance unless expressly included in your quotation. Immersion fluid, pipework, pumps, dry coolers and heat recovery equipment must be itemised before an installation is ordered.

Cooling explained

Show how the cooling works

See how this cooling method moves heat away from the mining hardware.

Air through the machines

Fans move air through the miners, collecting heat before discharging it outside. A clear path between the filtered inlet and exhaust helps prevent hot air returning to the machines.

Why choose air

The hardware remains directly accessible, and standard air cooled miners can be serviced without draining a liquid circuit. Filters can be selected for the site environment.

What the site needs

Size ventilation for the fleet and local temperature. Consider dust, filter resistance and sound at the site boundary. The sum of fan catalogue ratings is not a measurement of installed airflow.

Schematic illustration. Hydro and immersion diagrams show a separated circuit example; some systems connect directly to a compatible cooler. Heat reuse needs a suitable local demand and a separate engineered connection.

Mining with renewable generation

How should I use earnings per kWh?

It is estimated gross mining revenue divided by the electricity consumed by the miners and stated auxiliaries. Compare it with your electricity cost or the export income you would give up. It excludes maintenance, pool fees, taxes and other operating costs.

Can the package run only when surplus power is available?

The calculator models your selected operating hours. Actual output depends on the generation profile, startup time, control equipment and manufacturer operating limits. Automated curtailment and dispatch controls must be specified for your site.

Can I use the heat?

Electrical consumption becomes heat, but useful heat recovery depends on temperature, demand, pipework and heat exchangers. No heat revenue or heating saving is included in these figures.

How are package discounts calculated?

5–9 miners: 5%; 10–14: 8%; 15–19: 12%; 20 or more: 15%. The highest tier applies once to the miner subtotal. Infrastructure and delivery are excluded. Final package totals are rounded to £10; savings are the difference between the displayed totals. Additional cart volume discounts and coupons do not stack.